Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Solar Photovoltaic Locations

Showing last 55 of 55 unique locations - Page 1 of 3

Sort by: A-Z Components MW Date
land at Keelings Road, Southminster, CM0 7JF (1 component)
• New build generating CMU component known as Dengie Solar Park
• New build generating CMU component known as Dengie BESS
Active • 2027-28 (T-4), 2025-26 (T-1)
4.43 MW
(Estimated)
Wraxall Manor Farm, Wraxall, Dorset, DT2 0HW. (1 component)

New build generating CMU component - solar photovoltaic park known as Higher Wraxall Solar Park

Active • 2027-28 (T-4)
0.64 MW
(Estimated)
0.94 MW (Est from CMU)
(Estimated)
Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9TG (2 components)
• Solar PV generation site
• SolarPV generating station
• Solar photovoltaic generating station
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.58 MW (Est from CMU) (part of 0.58 MW aggregated CMU)
(Estimated)
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (1 component)
• New build generating CMU component - Whaddon Farm BESS
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park.
Active • 2027-28 (T-4), 2024-25 (T-1)
6.23 MW (Est from CMU)
(Estimated)
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (1 component)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
• New build 49.995MW / 99.990 MWh battery energy storage system.
Active • 2027-28 (T-4), 2025-26 (T-1)
18.20 MW
(Estimated)
Threemiletown Solar Farm Trinlaymire Farm Linlithgow West Lothian (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Active • 2025-26 (T-4)
0.99 MW (Est from CMU)
(Estimated)
Tarmac Quarry, Whisby, Lincoln, Lincolnshire, LN6 9BT (1 component)

New Build CMU comprising of Solar PV and associated plant

Active • 2028-29 (T-4)
0.47 MW
(Estimated)
Tarmac Dunbar, Dunbar Works, Dunbar, East Lothian, EH42 1SL (1 component)

New Build CMU comprising of Solar PV and associated plant.

Active • 2028-29 (T-4)
1.25 MW
(Estimated)
Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (2 components)
• The site comprises of gas reciprocating unit(s)
• Gas fired reciprocating engine(s)
• Solar PV generation site
Active • 2025-26 (T-4), 2023-24 (T-4) ...
3.37 MW (Est from CMU)
(Estimated)
0.89 MW
(Estimated)
South Lowfield Farm, Lowfield Lane, Kirkby Fleetham, Northallerton, North Yorkshire DL7 0SY (1 component)

Solar PV generating asset with a TIC of 50 MWp and a connection capacity of 40 MVA. It was commissioned on 14/07/2021.

Active • 2028-29 (T-4), 2025-26 (T-1)
6.80 MW
(Estimated)
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (1 component)
• CMU is a photovoltaic system
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
25.17 MW (Est from CMU)
(Estimated)
Rolleston Park Farm, Lodge Hill, Tutbury, Staffordshire, DE13 9HQ (1 component)

12 MW Solar PV Array

Active • 2028-29 (T-4), 2025-26 (T-1)
1.41 MW
(Estimated)
Rhyd y Groes, Llanbadrig, Rhosgoch, Isle of Anglesey, LL66 0AT (1 component)
• CMU is a photovoltaic system
• Porth Wen MPAN ID: 1300061061592 CMU is a photovoltaic system connected to the distribution system.
Active • 2025-26 (T-1), 2024-25 (T-1)
5.22 MW (Est from CMU)
(Estimated)
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (2 components)

Solar PV generation site

Active • 2027-28 (T-4), 2025-26 (T-1) ...
1.43 MW (Est from CMU) (part of 1.43 MW aggregated CMU)
(Estimated)
2.50 MW
(Estimated)
Manor Farm, Church Road, Maiden Newton, Dorchester, DT2 0AA (1 component)

Solar Voltaic generation scheme connected to the distribution network

Active • 2025-26 (T-4)
0.83 MW (Est from CMU)
(Estimated)
Malmpit Hill, Codford, Wiltshire, England, BA12 0FD (1 component)
• Existing Solar PV
• Solar PV
Active • 2025-26 (T-1), 2024-25 (T-1)
1.32 MW
(Estimated)
Lower Strensham PV, Bourne Road, Worcester, WR8 9DT (1 component)

40 MW solar PV site with a 25 MW export connection. Commissioned 29/01/2021.

Active • 2028-29 (T-4), 2025-26 (T-1)
5.84 MW
(Estimated)
4.98 MW (Est from CMU)
(Estimated)
Llanwern Farm Solar Park, Whitson, Newport, NP18 2AY (1 component)

75 MW solar PV site with a 50 MVA export connection. Commissioned on 10/03/2021.

Active • 2028-29 (T-4), 2025-26 (T-1)
11.70 MW
(Estimated)
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (1 component)

The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..

Active • 2027-28 (T-4), 2026-27 (T-4)
2.49 MW
(Estimated)
Little Staughton Airfield Solar Park, Top Farm, Staploe, Saint Neots, PE19 5JB (1 component)

A 50 MWp solar asset with a 40 MW grid connection. Commissioned on 26/02/2021.

Active • 2028-29 (T-4), 2025-26 (T-1)
9.33 MW
(Estimated)
Ling Hall Coalpit Lane Lawford Heath Rugby Warwickshire CV23 9HH (1 component)

SolarPV generating station

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.65 MW (Est from CMU) (part of 1.65 MW aggregated CMU)
(Estimated)
Loading map...