Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h) Locations

Showing last 73 of 73 unique locations - Page 1 of 3

Sort by: A-Z Components MW Date
134.75 MW
(Estimated)
adjacent to National Grid Stalybridge substation SK15 3DA (1 component)

75MW battery storage located near to the National Grid Stalybridge substation.

Active • 2027-28 (T-4)
23.09 MW
(Estimated)
adjacent to Kilmarnock South Substation KA1 3TN (1 component)

Lithium ion battery storage plant

Active • 2026-27 (T-4), 2025-26 (T-1)
107.51 MW
(Estimated)
West Marsh Road Spalding Lincolnshire PE11 3BB (2 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
259.70 MW (Est from CMU)
(Estimated)
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1)
0.09 MW (part of 0.09 MW aggregated CMU)
(Estimated)
Water Pumping Station, Watson Road, MK42 6BL (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1)
14.09 MW (Est from CMU) (part of 14.09 MW aggregated CMU)
(Estimated)
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (1 component)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
62.68 MW
(Estimated)
Unit 1-2, Merrivale Road, Exeter Road Industrial Estate, Okehampton, EX20 1UD (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW (part of 0.27 MW aggregated CMU)
(Estimated)
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW (part of 0.16 MW aggregated CMU)
(Estimated)
Tyrant Farm, Treowen, Newbridge, Newport, NP11 3BS (1 component)

New Build Battery Storage Facility

Active • 2028-29 (T-4)
10.44 MW
(Estimated)
Two Parcels Of Land Lying To The North West And South West Of Farm Road, Brackley NN13 7EB (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.31 MW (part of 0.31 MW aggregated CMU)
(Estimated)
Tillingdown Lane, Caterham, CR3 7JA (1 component)
• A Distribution Connected Battery Energy Storage System
• A 12MW Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
15.04 MW
(Estimated)
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (1 component)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2028-29 (T-4)
584.36 MW
(Estimated)
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (2 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4), 2025-26 (T-1)
55.01 MW
(Estimated)
Tabor Avenue Reservoir, CM7 1FB (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1)
0.62 MW (Est from CMU) (part of 0.62 MW aggregated CMU)
(Estimated)
Stephenson Road, Colchester Business Park, CO4 9QP (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1)
0.09 MW (part of 0.09 MW aggregated CMU)
(Estimated)
Station Rd, Clowne, Chesterfield S43 4AB (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW (part of 0.27 MW aggregated CMU)
(Estimated)
Spring Lane, Gedling, Nottinghamshire, NG4 4PD (1 component)

New Build Storage Facility

Active • 2028-29 (T-4)
75.13 MW
(Estimated)
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW (part of 0.27 MW aggregated CMU)
(Estimated)
Sewage Treatment Works, Chelmsford Road, Dunmow, CM6 1XG (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1)
0.09 MW (Est from CMU) (part of 0.09 MW aggregated CMU)
(Estimated)
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW (part of 0.27 MW aggregated CMU)
(Estimated)
Loading map...