Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto

All Locations

4376 unique locations (18661 components) - Page 1 of 176

Sort by: Relevance A-Z Components MW Date
100 Cathcart Rd, Glasgow G42 7BH (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
100 Montifichet Road, Westfield, Stratford E20 1GR (44 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
16.59 MW
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (8 components)
β€’ 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
β€’ 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
111 Brancroft Way Enfield Middlesex EN3 7PL (13 components)

Enfield CCGT Power Station - (one unit station) (3)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
1217.86 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
β€’ 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
β€’ 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
β€’ One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
132 Manchester Road, Carrington, Trafford, Greater Manchester, England, M31 4AY, (1 component)

Hydrogen Production plant consisting of three of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.

Active β€’ 2027-28 (T-4)
160 Corporation Road, Newport, Gwent, NP19 0WF (8 components)
β€’ 0.39MW Battery Storage located at Newport Bus depot (2)
β€’ Bus depot site
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW. (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (4 components)
β€’ This CMU is 10*2MW reciprocating engines using HVO.
β€’ This CMU is 10*2MW reciprocating engines.
β€’ This CMU is 6*2MW reciprocating engines.
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
18.70 MW
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
β€’ Combined Cycle Gas Turbine (2)
β€’ Combined Cycle Gas Turbine plant
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
1961.87 MW
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
2 Bar Lane, York, YO51 9LS (90 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms (3)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
2 Engineers Way, Wembley, Middlesex, HA9 0JS (6 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
8.39 MW
2 Samworth Way, Melton Mowbray LE13 1GA (5 components)

Existing Generation on existing site - CHP (3)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
4.00 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (26 components)
β€’ Operational gas reciprocating engine. (2)
β€’ Operational Reciprocating Engine
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
301 Camberwell New Rd, Camberwell, London, SE5 0TF (9 components)
β€’ 1.26MW Battery Storage located at Abellio Walworth depot
β€’ Battery Storage and demand reduction located at Abellio Walworth bus depot
β€’ Bus depot site
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
318 Edinburgh Rd, Brakes Newhouse, Motherwell, ML1 5SY, United Kingdom (8 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
34 Bochum Parkway, S8 8JR (1 component)

A Distribution Connected Battery Energy Storage System

Active β€’ 2027-28 (T-4)
3.08 MW
37 Wenlock Way, Leicester LE4 9HU (3 components)

bus depot (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
44-48 E Dock St, Dundee DD1 3JS (5 components)

Bus depot site (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
β€’ Gas CHP engines in commercial horticultural usage with no auxilliary load (2)
β€’ 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
4.25 MW
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (3)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
21.54 MW
4 Chemistry Ln, Pentre, Deeside CH5 2DA, UK (4 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
26.16 MW
4 Finway Road Hemel Hempstead HP2 7PT (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
5 Coulman St, Thorne, Doncaster DN8 5JT (1 component)

new build on site generating CMU

Active β€’ 2027-28 (T-4)
1.37 MW
Showing 25 locations
BESbswy