Home List View Map View Technologies Companies Support Us Help Login Register
Theme

All Locations

16009 unique locations (49137 components) - Page 1 of 641

(00325) Birm Acocks Green - South Birmingham B27 6BH (1 component)

Commercial sites

Active • 2024-25 (T-1)
100 Cathcart Rd, Glasgow G42 7BH (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
100 Montifichet Road, Westfield, Stratford E20 1GR (36 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.59 MW
100 Princes Road Hulme, Manchester, M15 5AS (9 components)
• Load curtailment (4)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
100 The Jewel, Brunstane, Edinburgh, EH15 3AR (10 components)
• Load reduction on site supported by non-exporting standby generation. (3)
• Load curtailment from refridgeration
• Load reduction from refrigeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
10-14 Birmingham Road, West Bromwich, B71 4LD (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
1020 CENTRE PARK, WARRINGTON WA1 1QL (1 component)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.

Inactive • 2020-21 (T-4)
1020 CENTRE PARK, WARRINGTON WA1 1QY (2 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (8 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local … (3)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
1020 SLUTCHERS LANE, WARRINGTON, WA1 1QL (3 components)

gas generation (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
105 Kelynmead Road Sheldon, Birmingham, B338LF (9 components)
• Load curtailment (4)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
106 Scrubs Lane, Willesden, NW10 6QY (1 component)

"EMR European Metal Recycling 106 Scrubs Lane, Willesden, NW10 6QY The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
107/111 High Street Wath Upon Dearne, Rotherham, S63 7PX (9 components)
• Load curtailment (4)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
108/110 High Street Strood, Kent, ME2 4TR (9 components)
• Load curtailment (7)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1092 Ransomes Way, Ipswich IP3 8TF, UK (1 component)

16MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-4)
10 Queens Drive , Kilmarnock, KA1 3XF (9 components)
• Load curtailment (7)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
110-114 High Street , Hoddesdon, EN118HD (9 components)
• Load curtailment (7)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1-10 Queen Elizabeth Square - South Woodham Ferrer CM3 5SY (12 components)
• Load drop (5)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
111-127 Front Street NG5 7ED (6 components)
• Load drop (4)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)

Enfield CCGT Power Station - (one unit station) (10)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1217.86 MW
112 Beddington Lane, Beddington CR0 4TB (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
112 Beddington Lane, Croydon, CR0 4TB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
114 London Road SK7 4AG (6 components)
• Load drop (4)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
118 Forest Road New Ollerton, Newark, NG229PL (9 components)
• Load curtailment (4)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
118 Gawber Road, Barnsley, S75 2EP (1 component)

Gas Fired CHP

Inactive • 2017-18 (T-1)
Loading map...
Showing 25 locations