Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "BH21"

17 unique locations (51 components)

Sort by: Relevance A-Z Components MW Date
23 Whittle Road, Ferndale Industrial Estate, Wimborne, BH21 7PW (6 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.03 MW (Est from CMU)
(Mixed)
BH21 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
BH21 3RG (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
BLACK WATER DRIVE WIMBORNE DORSET BH21 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
CHURCH ROAD THREE LEGGED CROSS WIMBORNE DORSET BH21 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.06 MW (Est from CMU)
(Estimated)
Emmers Farm, Holt Road, BH21 7HJ (2 components)

2h-duration battery system

Active • 2028-29 (T-4), 2025-26 (T-1)
15.87 MW
(Estimated)
Holt Road, Wimborne, BH21 6SD (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
Land at Sturts Farm, Three Cross Road, West Moors, Ferndown, BH21 6QU (1 component)

98MW / 196MWh BESS

Active • 2026-27 (T-4)
23.16 MW
Land on the north west side of Holt Road, Mannington Heath, Wimborne BH21 6SE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2028-29 (T-4)
6.82 MW
(Official)
Wimbourne Bournemouth BH21 5EP (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
Loading map...
Showing 10 locations