Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CB25"

17 unique locations (131 components)

Sort by: Relevance A-Z Components MW Date
60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
5.50 MW (Est from CMU)
(De-rated)
Ely Road Waterbeach Cambridge Cambridgeshire CB25 9PG (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(De-rated)
Goosehall Farm, Factory Road, Burwell, CB25 0BN (4 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system …

Active • 2025-26 (T-4), 2022-23 (T-1)
No capacity data
(De-rated)
Land at Weirs Drove, Cambridge, CB25 0BP (9 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.56 MW
(De-rated)
Land North West Of Electricity Sub-Station Weirs Drove Burwell CB25 0BP (1 component)

30MW/30MWh one hour battery storage asset located near BURWB1 asset

Inactive • 2026-27 (T-4)
3.54 MW
(De-rated)
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (7 components)
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total connection capacity of 1.5MW.
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total connection capacity of 4.5MW.
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection capacity of 9MW.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
16.20 MW
(De-rated)
Land to the East of Weirs Drove, Burwell, Cambridge, CB25 0BP, UK (1 component)

The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.

Inactive • 2021-22 (T-4)
No capacity data
(De-rated)
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (3 components)
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
• CMU is a photovoltaic system
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.22 MW
(De-rated)
The fields close to Chear Farm Bungalow, Ely Road, Chittering, Cambridge, CB25 9PN (4 components)
• FENGEN (CMU) is a load reduction asset using lighting and battery energy storage (BESS) for growing of vegetables on an industrial scale.
• FENGH2 (CMU) is a new build generating 06.000MW gas fired CHP plant.
Active • 2028-29 (T-4)
10.82 MW
(De-rated)
Loading map...
Showing 9 locations