Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CH2"

15 unique locations (47 components)

Sort by: Relevance A-Z Components MW Date
Ash Rd, Elton, Chester, CH2 4LF (2 components)

Manufacturing site

Inactive • 2017-18 (TR)
No capacity data
Ash Road, Elton, Chester, CH2 4RX (3 components)

A new build, gas fuelled generation station.

Inactive • 2028-29 (T-4)
46.28 MW
Ash Road, Protos, CH2 4LB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
No capacity data
Ash Road, Protos, CH2 4RX (1 component)

49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Active • 2024-25 (T-4)
No capacity data
CH2 (8 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.04 MW
Flag Lane North, Chester, Cheshire, CH2 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
0.04 MW (Est from CMU)
(Estimated)
No capacity data
(Estimated)
Land off Ash Road, Elton, Chester CH2 4LB (9 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
Land Off Ash Road, Elton, Chester, CH2 4LB (9 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
Land off Ash Road, Ince, Elton, Cheshire West and Chester, CH2 4RX (2 components)

A new build, gas fuelled generation station.

Active • 2025-26 (T-4)
No capacity data
Land off Perimeter Road, Ince, Elton, CH2 4RX (2 components)
• A new build, gas fueled generation station
• A new build, gas fuelled generation station.
Active • 2026-27 (T-4), 2025-26 (T-4)
4.28 MW
Perimeter Road, Elton, Ellesmere Port CH2 4LB (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
Perimeter Road, Ince, Elton, Cheshire West & Chester, CH2 4RX (2 components)

A new build, battery energy storage system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
5.47 MW
(Official)
Plot 8 Protos Grinsome Road Elton CH2 4LF (1 component)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist …

Inactive • 2022-23 (T-4)
No capacity data
Plot 8 Protos Grinsome Road Elton CH2 4NR (2 components)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will …

Active • 2024-25 (T-4), 2023-24 (T-4)
No capacity data
Loading map...
Showing 15 locations