Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CH2"

16 unique locations (73 components)

Sort by: Relevance A-Z Components MW Date
Ash Rd, Elton, Chester, CH2 4LF (3 components)

Manufacturing site

Inactive • 2017-18 (TR)
No capacity data
(De-rated)
Ash Road, Elton, Chester, CH2 4RX (3 components)

A new build, gas fuelled generation station.

Active • 2028-29 (T-4)
46.28 MW
(De-rated)
Ash Road, Protos, CH2 4LB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
No capacity data
(De-rated)
Ash Road, Protos, CH2 4RX (1 component)

49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Active • 2024-25 (T-4)
No capacity data
(De-rated)
CH2 (26 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.23 MW
(De-rated)
Flag Lane North, Chester, Cheshire, CH2 (1 component)

EV charging on residential premises

Inactive • 2026-27 (T-4)
0.04 MW
(De-rated)
No capacity data
(De-rated)
Land off Ash Road, Elton, Chester CH2 4LB (12 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(De-rated)
Land Off Ash Road, Elton, Chester, CH2 4LB (12 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(De-rated)
Land off Ash Road, Ince, Elton, Cheshire West and Chester, CH2 4RX (2 components)

A new build, gas fuelled generation station.

Active • 2025-26 (T-4)
No capacity data
(De-rated)
Land off Perimeter Road, Ince, Elton, CH2 4RX (2 components)
• A new build, gas fueled generation station
• A new build, gas fuelled generation station.
Active • 2026-27 (T-4), 2025-26 (T-4)
4.28 MW
(De-rated)
Perimeter Road, Elton, Ellesmere Port CH2 4LB (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(De-rated)
Perimeter Road, Ince, Elton, Cheshire West & Chester, CH2 4RX (2 components)

A new build, battery energy storage system

Active • 2028-29 (T-4), 2027-28 (T-4)
5.47 MW
(De-rated)
Plot 8 Protos Grinsome Road Elton CH2 4LF (1 component)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist …

Inactive • 2022-23 (T-4)
No capacity data
(De-rated)
Plot 8 Protos Grinsome Road Elton CH2 4NR (2 components)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will …

Active • 2024-25 (T-4), 2023-24 (T-4)
No capacity data
(De-rated)
Loading map...
Showing 15 locations