4 Chemistry Lane, Pentre, Deeside CH5 2DA, UK (1 component)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2028-29 (T-4)
12.86 MW
(Official)
4 Chemistry Lane, Pentre, Deeside, CH5 2DW (3 components)

14MW Power plant comprising 7x2MW gas reciprocating engines. The power plant is connected to the local distribution and gas network. (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
39.39 MW (Est from CMU)
(De-rated)
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (14 components)

Peak power plant (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
143.17 MW (Est from CMU)
(De-rated)
4 Chemistry Ln, Pentre, Deeside CH5 2DA, UK (4 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
52.47 MW (Est from CMU)
(Mixed)
Asda Queensferry, Aston Road , Deeside, CH5 1TP (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.30 MW (Est from CMU)
(De-rated)
ASDA Queensferry, Aston Road , Deeside, CH5 1TP (2 components)

Disabling load of refrigeration plant through remote switch.

Inactive • 2019-20 (T-1)
0.09 MW (Est from CMU)
(De-rated)
Asda Queensferry, Iceland Foods Second Avenue Deeside Industrial Park Deeside Flintside CH5 2NW (5 components)

Mix of load reduction and standby generation (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
5.09 MW (Est from CMU)
(De-rated)
Bennetts Lane Deeside Clwyd CH5 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.01 MW
CH5 (7 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.0050 MW
(De-rated)
Chemistry Lane, Interlinq Trade Park, Queensfery, Flintshire, CH5 2DW (6 components)
• 14 MW power plant comprising 7 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 14 MW power plant comprising of 7 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network. The site is currently going through commissioning activities and only has metered data for 2MW, therefore the company is prequalifying 2MW of existing capacity.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
No capacity data
Chemistry Lane, Pentre, Deeside, CH5 2DW (4 components)

14MW Power plant comprising 7x2MW gas reciprocating engines. The power plant is connected to the local distribution and gas network.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
Connah's Quay 400 kV Substation, Kelsterton Lane, Connah?s Quay, Flintshire, North Wales, CH5 4BP (12 components)

The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
No capacity data
Deeside 400kV Substation, Kelsterton Road, Connahs Quay, Deeside, Clwyd, CH5 4BP (3 components)

The East West Interconnector (EWIC) is a 400kV HVDC link between Deeside in Wales and Woodland in Ireland.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(Estimated)
Deeside, Engineer Park, Sandycraft, CH5 2QD (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
No capacity data
(Estimated)
DEESIDE IND PARK DEESIDE CLWYD, CH5 2TW (2 components)

Vehicle manufacturing plant

Inactive • 2017-18 (TR)
No capacity data
(Estimated)
Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL (4 components)
• Deeside CCGT Power Station.
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text on the EMR Portal screen mentions Rule 3.6.3(b) and the commitment to secure TEC by 18 months before the Delivery Year. DEEP_1 is applying for the Supplementary Auction only and therefore this option has been used in relation to Rule 3.10A.2, where TEC is required by 6 months prior to the Delivery Year.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
No capacity data
(Estimated)
Deeside Power Station Zone 4 Weybridge Road Deeside Industrial Park Flintshire CH5 2UL (2 components)
• Gas Reciprocating Engines
• Grid Scale Battery Energy Storage.
Inactive • 2028-29 (T-4)
53.91 MW
Hawarden Industrial Park Clwyd Close Manor Lane Hawarden Deeside CH5 3PZ (12 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (65 components)
• Connah's Quay PS Unit 1 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1255.11 MW
LAND AT WEIGHBRIDGE ROAD DEESIDE CH5 2LL (6 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
Parc Adfer Energy Recovery Facility Deeside Industrial Park Deeside Flintshire CH5 2LL (1 component)

An energy from waste facility located in North Wales and designed to generate electricity

Inactive • 2020-21 (T-4)
No capacity data
Prospect House Sandycroft Deeside CH5 2QJ (10 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
SANDY WAY CONNAH'S QUAY DEESIDE CLWYD CH5 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.01 MW
SHAKESPEARE AVENUE HAWARDEN DEESIDE CLWYD CH5 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.01 MW
Shotton Steelworks, Deeside, Flintshire, CH5 2LF (1 component)

16 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-4)
No capacity data