Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CH6"

117 unique locations (579 components) - Page 1 of 4

Sort by: Relevance A-Z Components MW Date
Aber Park Road, Flint Flintshire CH6 5EX (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
0.71 MW (Est from CMU)
(De-rated)
Arden Drive NESTON CH64 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
0.02 MW (Est from CMU)
(De-rated)
Asda Bromborough, Welton Road Croft Business Park, Bromborough, CH62 3QP (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.26 MW (Est from CMU)
(De-rated)
ASDA Bromborough, Welton Road Croft Business Park, Bromborough, CH62 3QP (3 components)

Disabling load of refrigeration plant through remote switch.

Inactive • 2019-20 (T-1)
0.13 MW (Est from CMU)
(De-rated)
Asda Ellesmere Port, Grange Road CH65 0BZ (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
No capacity data
(De-rated)
Asda Flint, Hollyhead Rd Flint, Clwyd, CH6 5GB (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
No capacity data
(De-rated)
BARNES GREEN, WIRRAL, MERSEYSIDE, CH63 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
0.04 MW
(De-rated)
Barnston Road Thingwall Wirral Merseyside CH61 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.0097 MW
(De-rated)
BERWYN BOULEVARD WIRRAL MERSEYSIDE CH63 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
0.02 MW
(De-rated)
Boots, Ellesmere Prt Cheshr Oak - Wirral and Chester CH65 9HD (1 component)

Commercial sites

Active • 2024-25 (T-1)
No capacity data
(De-rated)
BPI. Films - Bromborough, 40 Thursby Road, Croft Business Park, Bromborough, CH62 3PZ (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
No capacity data
(De-rated)
BPI. Packaging Services - Flint, Units 3 & 4 Manor Farm Estate, Flint, CH6 5UY (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-1)
No capacity data
(De-rated)
Bridgewater Paper Mill, North Road, Ellesmere Port CH65 1AL (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(De-rated)
Capenhurst Lane Cheshire CH66 2NT (1 component)

A 99.8MW battery storage system comprising approx 13 skids, to be installed at Capenhurst Lane

Active • 2025-26 (T-4)
No capacity data
(De-rated)
CH6 (13 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.16 MW
(De-rated)
CH60 (15 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.03 MW
(De-rated)
CH61 (5 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
(De-rated)
CH62 (14 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
(De-rated)
CH63 (28 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
(De-rated)
CH64 (30 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.17 MW
(De-rated)
CH65 (15 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.0060 MW
(De-rated)
CH66 (35 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.21 MW
(De-rated)
Cheshire Power Station (Formally known as 'Bridgewater Paper') North Road Ellesmere Port CH65 1AF (4 components)
• 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
• New build 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
Inactive • 2019-20 (T-1), 2018-19 (T-1)
No capacity data
(De-rated)
No capacity data
(De-rated)
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (7 components)
• CMU will be formed of multiple individual gas reciprocating gas engines.
• CMU will be formed of multiple individual reciprocating gas engines.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
19.04 MW
(De-rated)
Loading map...
Showing 25 locations