Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CH65 1AF"

10 unique locations (41 components)

Sort by: Relevance A-Z Components MW Date
Cheshire Power Station (Formally known as 'Bridgewater Paper') North Road Ellesmere Port CH65 1AF (4 components)
• 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
• New build 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
Inactive • 2019-20 (T-1), 2018-19 (T-1)
No capacity data
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (7 components)
• CMU will be formed of multiple individual gas reciprocating gas engines.
• CMU will be formed of multiple individual reciprocating gas engines.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
19.04 MW
No capacity data
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (11 components)
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
40.58 MW
RWE Cogen UK Limited (formerly know as Bridgewater Paper CHP) North Road Ellesmere Port South Wirral CH65 1AF (2 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• One (1) Open Cycle Gas Turbine
Inactive • 2021-22 (T-4)
No capacity data
RWE Cogen UK Ltd North Road Ellesmere Port Cheshire CH65 1AF (3 components)

CMU will be formed of multiple individual gas reiprocating engine units

Inactive • 2017-18 (T-1)
No capacity data
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (7 components)
• CMU will be formed of multiple individual gas reiprocating engine units
• Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter
Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel.

Active • 2026-27 (T-4), 2025-26 (T-4)
3.54 MW
Loading map...
Showing 10 locations