Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CM9"

18 unique locations (127 components)

Sort by: Relevance A-Z Components MW Date
Asda Heybridge, Colchester Road Heybridge, Maldon, CM9 4GD (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
No capacity data
(De-rated)
Causeway Power, The Causeway Industrial Site, Maldon, CM9 4GG (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4)
1.18 MW
(De-rated)
CM9 (48 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.03 MW
(De-rated)
Connect House, Bates Road, Quayside Industrial Estate, Maldon, CM9 5FA (1 component)

14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-4)
No capacity data
(De-rated)
Connect House, Bates Road, Quayside Industrial Estate, Maldon, Essex, CM9 5FA (9 components)
• 14MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
(De-rated)
Desch Plantpak, Burnham Rd, Maldon, CM9 6NT, UK (34 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
No capacity data
(De-rated)
Essex & Suffolk Water PLC Pumping Station No 1 Feeder 1 Hatfield Road Langford Chelmsford Essex, CM9 6QA (4 components)

3 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
(De-rated)
Farm Back Road Tolleshunt D'Arcy MALDON Essex CM9 (1 component)

EV charging at residential premises

Inactive • 2026-27 (T-4)
0.0097 MW
(De-rated)
LAND ADJOINING BATES ROAD QUAYSIDE INDUSTRIAL ESTATE MALDON CM9 5FA (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Inactive • 2024-25 (T-4)
No capacity data
(De-rated)
Land east of Maldon Hall Farm Maldon Essex CM9 6HD (1 component)

40MW of battery storage located in Essex

Inactive • 2021-22 (T-4)
No capacity data
(De-rated)
Land East of Maldon Hall Farm, Maldon, Essex CM9 6HD (4 components)

40 MW/40MWh BESS

Active • 2025-26 (T-4), 2024-25 (T-1) ...
7.44 MW
(De-rated)
MARLPITS ROAD WOODHAM MORTIMER MALDON ESSEX CM9 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
(De-rated)
No capacity data
(De-rated)
POST OFFICE ROAD, WOODHAM MORTIMER, MALDON, CM9 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Inactive • 2025-26 (T-1)
No capacity data
(De-rated)
Sadds Wharf, Station Road, Maldon, Essex, CM9 4LQ (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(De-rated)
WOODHAM WALTER PUMPING STATION, LITTLE BADDOW ROAD, WOODHAM WALTER, MALDON , CM9 6RU (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(De-rated)
Loading map...
Showing 16 locations