Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CO4"

10 unique locations (42 components)

Sort by: Relevance A-Z Components MW Date
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO4 0XB (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2022-23 (T-1), 2021-22 (T-4)
1.11 MW (Est from CMU)
(De-rated)
Asda Colchester, Turner Rise CO4 5TU (8 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.25 MW (Est from CMU)
(De-rated)
BRAITHWAITE DRIVE COLCHESTER CO4 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
CO4 (20 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
Cps House, Stephenson Road, Severalls Industrial Park, Colchester, CO4 9QR (3 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.79 MW
(Estimated)
HIGH LIFT PUMP STATION, SKY HALL HILL, LANGHAM, COLCHESTER, CO4 5TD (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
No capacity data
Kirby Drive Colchester Essex CO4 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.05 MW
SPRING CLOSE, HIGHWOODS, COLCHESTER, ESSEX, CO4 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
0.04 MW
Stephenson Road, Colchester Business Park, CO4 9QP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Loading map...
Showing 10 locations