Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "DA9"

11 unique locations (31 components)

Sort by: Relevance A-Z Components MW Date
Asda Greenhithe, Crossways Boulevard DA9 9BT (8 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.25 MW (Est from CMU)
(De-rated)
BARNFIELD CLOSE GREENHITHE KENT DA9 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
CASTLERIDGE DRIVE DARTFORD KENT DA9 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0080 MW
Crossways, Greenhithe, DA9 9BB (3 components)
• 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
DA9 (1 component)

Domestic demand turn down

Active • 2024-25 (T-1)
0.04 MW (Est from CMU)
(Estimated)
HAVELOCK DRIVE DARTFORD KENT DA9 (4 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.02 MW (Est from CMU)
(Estimated)
Marks and Spencer, Bluewater Pkwy, Dartford, Greenhithe DA9 9SD (5 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.45 MW
(De-rated)
Parkwood Hill Greenhithe England DA9 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.01 MW
Sara Crescent GREENHITHE KENT DA9 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
Stone Pit 1, Cotton Lane, Dartford, Kent DA9 9BB (4 components)
• Storage equipment to be installed. The storage asset will be built in an existing building.
• The site will consist of a number of reciprocating machines - it is currently envisaged that these will be diesel.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
SYLVAN MEWS GREENHITHE DA9 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
Loading map...
Showing 11 locations