Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "HR1"

30 unique locations (80 components) - Page 1 of 2

Sort by: Relevance A-Z Components MW Date
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (9 components)

Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
261.87 MW (Est from CMU)
(Mixed)
ALICE CLOSE HEREFORD HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
50.76 MW (Est from CMU)
(De-rated)
BURDON DRIVE BARTESTREE HEREFORD HEREFORDSHIRE HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
No capacity data
CHURCH LANE HAMPTON BISHOP HEREFORD HEREFORDSHIRE HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
No capacity data
Clay Hill Pit Hereford HR1 4EP (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
Clay Pit Hill Peak Lopping Gas Station Dormington HR1 4EE (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
No capacity data
(Estimated)
Dormington Solar PV Generating Plant, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (1 component)

Existing CMU comprising of Solar PV and associated plant.

Active • 2025-26 (T-1)
2.22 MW
(Estimated)
FOWNHOPE COURT FOWNHOPE HEREFORD HEREFORDSHIRE HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
No capacity data
(Estimated)
Fownhope, Hereford, HR1 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
(Estimated)
HAFOD ROAD HEREFORD HEREFORDSHIRE HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
No capacity data
(Estimated)
HAMPTON BISHOP, HEREFORD, HEREFORDSHIRE, HR1 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
(Estimated)
HIGHLAND PLACE FOWNHOPE HEREFORD HEREFORDSHIRE HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
No capacity data
HR1 (6 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.04 MW
(De-rated)
LAMBOURNE THE ORCHARDS HAMPTON BISHOP HEREFORD HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
No capacity data
Land adjacent Electricity Substation, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (6 components)

New Build CMU comprising of Solar PV and associated plant

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.22 MW
Land at Clay Hill Pit, Dormington, Hereford, HR1 4EP (1 component)

Generation set identifier: FG Wilson / Leroy Somer LL9124L 15 identical low-voltage synchronous generators of the same design and rating (25 MW total capacity) Type of prime mover: diesel engine …

Inactive • 2020-21 (T-4)
No capacity data
Land West of Clay Hill Pit Larport farm Larport Lane Dormington Hereford HR1 4EP (1 component)

20 MW Battery Storage facility located at Hereford.

Inactive • 2021-22 (T-4)
No capacity data
Larport Farm, Clay Hill Pit, Hereford HR1 4EP, UK (1 component)

a 5MW/24MWh lithium Ion battery storage development

Inactive • 2020-21 (T-4)
No capacity data
Larport Farm Larport Lane Dormington Hereford HR1 4EP (9 components)

19.500 MW of battery storage located at Hereford.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
LICHFIELD AVENUE HEREFORD HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
No capacity data
LODGE HAMPTON BISHOP HEREFORD HEREFORDSHIRE HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
No capacity data
ORCHARD VALE BARTESTREE HEREFORD HEREFORDSHIRE HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
No capacity data
OVERBURY ROAD HEREFORD HEREFORDSHIRE HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
No capacity data
Red Norman Rise Holmer Hereford Herefordshire HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
No capacity data
SINCLAIR DRIVE HEREFORD HR1 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
No capacity data
Loading map...
Showing 25 locations