Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "LA1"

46 unique locations (252 components) - Page 1 of 2

Sort by: Relevance A-Z Components MW Date
Asda Barrow, Walney Road LA14 5UG (8 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.18 MW (Est from CMU)
(De-rated)
Asda Lancaster, Ovangle Road , Lancaster, LA1 5JR (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
No capacity data
(De-rated)
ASDA Lancaster, Ovangle Road , Lancaster, LA1 5JR (3 components)

Disabling load of refrigeration plant through remote switch.

Inactive • 2019-20 (T-1)
0.13 MW (Est from CMU)
(De-rated)
BANKS COAST ROAD RAMPSIDE BARROW-IN-FURNESS CUMBRIA LA13 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.0097 MW
(De-rated)
Bank, Sedbergh, Cumbria, LA10 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
0.04 MW
(De-rated)
BARN SUNNYSIDE FARM MEATHOP GRANGE-OVER-SANDS CUMBRIA LA11 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
1.63 MW
(De-rated)
Barrow Mill, Park Road, Barrow in Furness, Cumbria, LA14 4TR (20 components)

Paper Mill carrying out DSR using load turn-down.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
75.83 MW
(De-rated)
Bell Hill Park Grange-Over-Sands Cumbria LA11 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
1.63 MW
(De-rated)
Boots, Ulverston Market St - Lakes LA12 7LR (1 component)

Commercial sites

Active • 2024-25 (T-1)
No capacity data
(De-rated)
Canny Hill, Newby Bridge, Ulverston, LA12 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
(De-rated)
COTTAGE CHARNEY ROAD GRANGE-OVER-SANDS CUMBRIA LA11 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
1.63 MW
(De-rated)
Dent, Sedbergh, Cumbria, LA10 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
(De-rated)
FLASS LANE BARROW-IN-FURNESS CUMBRIA LA13 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0084 MW
(De-rated)
Gleneagles Drive LANCASTER LANCASHIRE LA1 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0084 MW
(De-rated)
Green Lane, Dalton-in-Furness, Cumbria, LA15 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
(De-rated)
KENTS BANK ROAD GRANGE-OVER-SANDS CUMBRIA LA11 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
1.63 MW
(De-rated)
LA1 (34 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.17 MW
(De-rated)
LA11 (14 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.04 MW
(De-rated)
LA12 (17 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.10 MW
(De-rated)
LA13 (12 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.10 MW
(De-rated)
LA14 (12 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.13 MW
(De-rated)
LA18 (2 components)

Domestic EV charger

Active • 2025-26 (T-1)
0.01 MW
(De-rated)
Lancaster University, Bailrigg, Lancaster, LA1 4YW (12 components)

Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.97 MW
(De-rated)
Meeting Business Park, Park Road, Ormsgill, Barrow-in-Furness, Cumbria, England, LA14 4TL, United Kingdom LA14 4TL (1 component)

Hydrogen Production plant consisting of six of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.

Active • 2027-28 (T-4)
No capacity data
(De-rated)
MILL GREENODD ULVERSTON CUMBRIA LA12 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
0.02 MW
(De-rated)
Loading map...
Showing 25 locations