Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "ML2"

12 unique locations (53 components)

Sort by: Relevance A-Z Components MW Date
ABBOTSFORD ROAD, WISHAW, LANARKSHIRE, ML2 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
0.04 MW (Est from CMU)
(Estimated)
Asda Newmains, Morningside Road , Newmains, ML2 9AS (11 components)
• Load curtailment (4)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.75 MW
(Estimated)
Blacklaw Windfarm, North Lanarkshire, ML2 9PJ (1 component)

1 x 75MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
8.86 MW
(Estimated)
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (6 components)
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
• 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.85 MW
(Estimated)
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, Scotland, ML2 0EF, United Kingdom (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Active • 2024-25 (T-4)
12.36 MW
(Estimated)
Land to the west (see map) of 18-20 Netherdale Rd, Netherton Industrial Estate, Wishaw ML2 0ER (6 components)
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
No capacity data
(De-rated)
ML2 (10 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
39.94 MW
(Estimated)
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (6 components)
• 1 x 4.2MW Onshore Wind Turbine Generator
• 1 x Wind Turbine Generating Unit
Active • 2026-27 (T-4), 2023-24 (T-1)
0.69 MW
(Estimated)
Yard (see map) near to 137 Netherton Street, Wishaw, ML2 0EY (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(De-rated)
Loading map...
Showing 9 locations