Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "NG2"

100 unique locations (770 components) - Page 1 of 4

1 Thane Road West, Nottingham, NG2 3AA (128 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
101.02 MW (Est from CMU)
(Estimated)
Bilsthorpe Energy Park - Former Colliery - Bilsthorpe - Newark - Notts - NG22 8ST (4 components)

2x 1.56MW Containerised Generating sets. Bilsthorpe Energy Park - Former Colliery - Bilsthorpe - Newark - Notts - NG22 8ST. Auxiliary load subtracted prior to the metering point.

Part of Alkane Energy Limited ALKANE ENERGY UK LIMITED NG22
Inactive • 2017-18 (T-1)
No capacity data
(De-rated)
Land off Baulker Lane - Clipstone - Mansfield - Notts - NG21 8BG (5 components)

5x 2MW Containerised Generating Sets. Clipstone 1 - Land off Baulker Lane - Clipstone - Mansfield - Notts - NG21 8BG. Auxiliary load subtracted prior to the metering point.

Part of Alkane Energy Limited ALKANE ENERGY CM LIMITED Rejected NG21
Inactive • 2017-18 (T-1)
No capacity data
(De-rated)
118 Forest Road New Ollerton, Newark, NG229PL (4 components)

Load curtailment (3)

DSR Part of RESERVE POWER HOLDINGS (JERSEY) LIMITED FLEXITRICITY LIMITED NG22
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
4.28 MW (Est from CMU)
(Estimated)
184 Loughborough Road NG2 7JA (2 components)

Load drop (2)

DSR Part of RESERVE POWER HOLDINGS (JERSEY) LIMITED FLEXITRICITY LIMITED NG2
Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.03 MW (Est from CMU)
(De-rated)
Asda Newark, Off Lombard Street NG24 1XG (8 components)
• Load curtailment from refridgeration
• Load drop
DSR Part of RESERVE POWER HOLDINGS (JERSEY) LIMITED FLEXITRICITY LIMITED NG24
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.43 MW
(Estimated)
Asda New Ollerton, 118 Forest Road New Ollerton, Newark, NG229PL (11 components)
• Load curtailment
• Load curtailment from refridgeration
DSR Part of RESERVE POWER HOLDINGS (JERSEY) LIMITED FLEXITRICITY LIMITED NG22
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
(Estimated)
Asda Nottingham West Bridgford, 184 Loughborough Road NG2 7JA (8 components)
• Load curtailment from refridgeration
• Load drop
DSR Part of RESERVE POWER HOLDINGS (JERSEY) LIMITED FLEXITRICITY LIMITED NG2
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.40 MW
(Estimated)
BEACON HEIGHTS NEWARK NOTTINGHAMSHIRE NG24 (3 components)

EV charging at residential premises

DSR EV Charging Part of Octopus Energy Group Limited OCTOPUS ENERGY LIMITED NG2
Inactive • 2023-24 (T-1)
0.0042 MW
(Estimated)
Bilsthorpe 1 Energy Park Former Colliery Bilsthorpe Newark Notts NG22 8ST (3 components)

1x 1.55MW Containerised Generating sets.

Part of Alkane Energy Limited ALKANE ENERGY UK LIMITED NG22
Inactive • 2016-17 (TR)
0.36 MW
(Estimated)
Bilsthorpe 1 Energy Park Former Colliery Bilsthorpe Newark Notts NG22 8ST (2 components)

1x 1.55MW Containerised Generating sets.

Part of Alkane Energy Limited ALKANE ENERGY UK LIMITED NG22
Inactive • 2016-17 (TR)
No capacity data
(De-rated)
Bilsthorpe Business Park, Off Eakring Road, Bilsthorpe, NG22 8ST (1 component)

Energy from Waste plant

Coal/biomass Part of CoGen Limited Bilsthorpe Bio Power Limited Not Prequalified NG22
Inactive • 2021-22 (T-4)
No capacity data
(De-rated)
Bilsthorpe Colliery Site Bilsthorpe Newark Notts NG22 8ST (1 component)

Gas reciprocating engines

Reciprocating engines Part of Alkane Energy Limited ALKANE ENERGY UK LIMITED Rejected NG22
Inactive • 2019-20 (T-1)
No capacity data
(De-rated)
Bilsthorpe Colliery Site Bilsthorpe Newark Notts NG22 8ST (3 components)

Gas reciprocating engines

Reciprocating engines Part of Alkane Energy Limited ALKANE ENERGY UK LIMITED Rejected NG22
Inactive • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
(De-rated)
Bilsthorpe Colliery Site,Bilsthorpe, Newark, Notts, NG22 8ST (4 components)

MWM TCG 2020 x 2 1 x CAT 3520

Part of Alkane Energy Limited ALKANE ENERGY UK LIMITED NG22
Inactive • 2017-18 (T-1)
No capacity data
(De-rated)
Boots, Newark Stodman St - South Lincs and North Cambs NG24 1AT (1 component)

Commercial sites

DSR Part of OAKTREE POWER GROUP LIMITED OAKTREE POWER LIMITED NG24
Active • 2024-25 (T-1)
0.80 MW
(Estimated)
Boots, Nottm West Bridgford - South Nottinghamshire NG2 5GR (1 component)

Commercial sites

DSR Part of OAKTREE POWER GROUP LIMITED OAKTREE POWER LIMITED NG2
Active • 2024-25 (T-1)
0.80 MW
(Estimated)
Boughton, Harrow Lane, Boughton, NG22 9ZB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Part of SEMBCORP ENERGY UK LIMITED UK Energy Reserve Limited Not Prequalified NG22
Inactive • 2020-21 (T-4)
No capacity data
(De-rated)
Bowbridge Lane, New Balderton Newark, NG24 3BZ United Kingdom (1 component)

Generating unit

Reciprocating engines Part of ENEL X INTERNATIONAL S.R.L. ENEL X UK LIMITED NG24
Active • 2025-26 (T-4)
No capacity data
(De-rated)
CHURCH ROAD CLIPSTONE VILLAGE MANSFIELD NOTTINGHAMSHIRE NG21 (3 components)

EV charging at residential premises

DSR EV Charging Part of Octopus Energy Group Limited OCTOPUS ENERGY LIMITED NG2
Inactive • 2023-24 (T-1)
0.0042 MW
(Estimated)
Cotham Grange PV Cotham Lane HAWTON Nottinghamshire NG24 3RJ (2 components)

50 MW solar photovoltaic plant commissioned on 18/01/21.

Active • 2028-29 (T-4), 2025-26 (T-1)
2.46 MW
(Estimated)
Cotham Grange PV Cotham Lane HAWTON Nottinghamshire NG24 3RJ (2 components)

50 MW solar photovoltaic plant commissioned on 18/01/21.

Active • 2028-29 (T-4), 2025-26 (T-1)
2.46 MW
(Estimated)
CROSSGATE DRIVE QUEENS DRIVE INDUSTRIAL ESTATE NOTTINGHAMSHIRE, NG2 1LW (3 components)

Manufacturing Chilled Savoury Products

Inactive • 2017-18 (TR)
No capacity data
(De-rated)
Digital Space Group, Brunel Drive, Jessop Cl, Newark NG24 2AG (4 components)

0.28MW - 0.34 MWh Battery Energy Storage System

DSR Part of STATKRAFT UK LTD BRYT ENERGY LIMITED Not Prequalified NG24
Active • 2025-26 (T-4), 2022-23 (T-1)
0.78 MW
(Estimated)
Doddington Road, Stubton, Newark, NG23 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
(Estimated)
Loading map...
Showing 25 locations