Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "OX11"

17 unique locations (146 components)

Sort by: Relevance A-Z Components MW Date
Asda Didcot, Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (25 components)

load curtailment at site (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
229.99 MW (Est from CMU)
(De-rated)
Booker Cash and Carry Didcot OX11 7HJ (7 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.14 MW
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (26 components)
• Didcot B5 - CCGT
• Didcot B6 - CCGT
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1357.80 MW
(De-rated)
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (52 components)
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate
Active • 2028-29 (T-4), 2027-28 (T-4) ...
283.02 MW
(Estimated)
Land at Fulscot Cottages, Didcot, Oxfordshire, OX11 9AA (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
Land at Fulscot, Didcot, OX11 9AA (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
No capacity data
Loyd Road, Didcot, OX11 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
Milton Road, Didcot, OX11 7HH (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
OX11 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
Plot 168, Block D, Unit 11 Greenwood Way OX11 6DL (8 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.69 MW (Est from CMU)
(De-rated)
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (6 components)

2 POSGU (1.0MW and 0.6MW)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
Loading map...
Showing 11 locations