Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "TA2"

16 unique locations (60 components)

Sort by: Relevance A-Z Components MW Date
Asda Wellington, Longforth Road TA21 8RQ (8 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.25 MW (Est from CMU)
(De-rated)
Bramley Close WELLINGTON SOMERSET TA21 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
BRENDON ROAD WELLINGTON SOMERSET TA21 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW
BRITTONS ASH BATHPOOL TAUNTON SOMERSET TA2 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.01 MW
Land at Exmoor Windows Brunel Way Minehead TA24 5BY (10 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.71 MW
Land at KWTN Solar Limited at JB Wheaton and Sons Limited, Station Road, S Chard TA20 4QN (3 components)

1.14MW Battery Storage Facility

Battery LIMEJUMP LTD Not Prequalified TA20
Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
Lyngford Road, Taunton, Somerset, TA2 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
Poundfield Road, Minehead , Somerset, TA24 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
TA2 (1 component)

Domestic EV charger

Active • 2025-26 (T-1)
0.01 MW
(De-rated)
TA21 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.09 MW
(De-rated)
TA22 (2 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
0.0040 MW
(De-rated)
TA23 0YA (5 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
TA24 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.01 MW
(De-rated)
TA24 6PJ (5 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
Wansborough Paper Mill, Watchet, Somerset, TA23 0AY (1 component)

New Build CMU comprising of battery storage and associated plant

Inactive • 2027-28 (T-4)
1.64 MW
XPO - Taunton, 29 Frobisher Way, Taunton TA2 6BB (12 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
No capacity data
Loading map...
Showing 16 locations