Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "UB8"

5 unique locations (31 components)

Sort by: Relevance A-Z Components MW Date
CHURCH ROAD UXBRIDGE MIDDLESEX UB8 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.04 MW
(Estimated)
COWLEY ROAD UXBRIDGE MIDDLESEX UB8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
97.73 MW
(Estimated)
SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
7.56 MW
(Estimated)
UB8 (13 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
48.98 MW
(Estimated)
Loading map...
Showing 4 locations