Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

10 unique locations (36 components)

Active MW: 5551.46 MW
Inactive MW: 299.50 MW
Carlton,Stockton-On-Tees,TS21 1EA (2 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
"Butchersfield Landfill Site, Rixton Old Hall, Manchester Road, Rixton, WARRINGTON, WA3 6EW" (2 components)

2 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Burning Ground Site Kingsnorth Works Industrial Estate Hoo Rochester ME3 9NZ (8 components)

New build battery

Battery Storage Roaring Hill Energy Storage Ltd Battery Energy Storage Services 3 KN 100MW Battery Energy Storage Services 3 KN 100MW +6 more Not Prequalified
Inactive • 2020-21 (T-4)
532.52 MW
Bulls Head Farm, Eakley Lanes, Newport Pagnell, MK16 8LP (2 components)

1 x 800kW/1100kWh Lithium Ion Battery (2)

Battery Storage LIMEJUMP LTD Not Prequalified
Inactive • 2020-21 (T-4), 2017-18 (T-1)
1.12 MW
Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT (2 components)

1 x 0.8MW / 1.1 MWh BYD Lithium Ion Battery: at Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bristol Avenue, Blackpool, FY2 0JF (7 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
39.24 MW
Bourne Park Solar Farm, Bourne Park, Piddlehinton, Dorset. DT2 7TU (2 components)

800kW/ 1100kWh BYD Lithium Ion Battery (2)

Battery Storage LIMEJUMP LTD Not Prequalified
Inactive • 2020-21 (T-4), 2017-18 (T-1)
1.12 MW
Bevercotes Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (2 components)

3 x 1MW / 1.2 MWh BYD Lithium Ion Battery (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Aldbrough Gas Storage Facility, HU11 4QG (1 component)

Battery Storage

Battery Storage SSE GENERATION LIMITED Aldbrough Battery Storage
Inactive • 2020-21 (T-4)
18.30 MW
350 Petre Street Sheffield S4 8LU (8 components)
• New build battery. (2)
• New build battery
Storage Battery Storage Petre Street Storage Ltd Battery Energy Storage Services 1 PS 15MW Battery Energy Storage Services 1 PS 15MW +6 more Not Prequalified
Inactive • 2021-22 (T-4), 2020-21 (T-4)
153.82 MW
Loading map...
Showing 10 locations