Battery Storage

9 unique locations (41 components)

Active MW: 51.47 MW
Inactive MW: 1248.93 MW
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (4 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Battery Storage Storage (Duration 0.5h) CLEATOR BATTERY STORAGE LIMITED New Build Generating CMU Cleator Storage Cleator Storage +1 more CA22
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
13.51 MW
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components) Geocoding Needed
• 0.8 MW of demand reduction
• 0.8MW demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
16.16 MW
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA13 0PQ (3 components) Geocoding Needed

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
67.43 MW
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)

A Prospective New Build Battery Storage facility (3)

Storage Battery Storage Storage (Duration 0.5h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU Roosecote EFR Roosecote EFR +1 more LA13
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Poplars, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (4 components) Geocoding Needed
• 1 MW of demand reduction
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
10.98 MW
Oaks, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components) Geocoding Needed
• 1000kW/1200kWh Lithium Ion Battery
• 1MW demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
11.49 MW
Milton Court Farm, Dorking, RH4 3LY (5 components) Geocoding Needed
• 5MW battery energy storage facility at Milton Court Farm, Dorking
• 6MW battery energy storage facility at Milton Court Farm, Dorking
Storage Battery Storage Storage (Duration 1h) GBSL DORKING LIMITED New Build Generating CMU GBSL Dorking GBSL Dorking +1 more RH4
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
9.17 MW
Lucern, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components) Geocoding Needed
• 1000kW/1200kWh Lithium Ion Battery
• 1MW demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
11.49 MW
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (6 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Battery Storage Storage (Duration 0.5h) GLASSENBURY BATTERY STORAGE LIMITED New Build Generating CMU Glassenbury Storage Glassenbury Storage +2 more TN17
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
55.99 MW