Coal/biomass

56 unique locations (584 components) - Page 1 of 3

Active MW: 45862.79 MW
Inactive MW: 2097.95 MW
Wolverhampton EfW Crown Street West Midlands WV1 1QB (1 component)

2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW

Coal/biomass Wolverhampton Waste Services Limited Existing Generating CMU Wolverhampton Incinerator Rejected WV1
Inactive • 2021-22 (T-4)
Wolverhampton EfW Crown Street West Midlands WV1 1QB (2 components)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change in registered address for WWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW
Coal/biomass Energy from Waste Wolverhampton Waste Services Limited Existing Generating CMU Wolverhampton Incinerator Wolverhampton Incinerator Rejected WV1
Inactive • 2019-20 (T-1), 2018-19 (T-1)
West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
• West Burton A Power Station CMU 1 WA1-17 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 2 WA2-17 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 3 WA3-17 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
OCGT Coal/biomass OCGT and Reciprocating Engines (Fuel Type - Diesel) EDF Energy Limited Existing Generating CMU West Burton A Power Station CMU 1 West Burton A Power Station CMU 1 +10 more DN22
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN (10 components)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff. (2)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export up to 35MW. Located in Glass Avenue, Cardiff.
Coal/biomass Energy from Waste VIRIDOR ENERGY LIMITED Existing Generating CMU Cardiff ERF Cardiff ERF +4 more CF24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
95.81 MW
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (9 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste SUEZ RECYCLING AND RECOVERY UK LTD Existing Generating CMU STV Lines 1 and 2 EfW STV Lines 1 and 2 EfW +2 more TS23
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.89 MW
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (2 components)

Existing Energy from Waste Plant (2)

Coal/biomass SUEZ RECYCLING AND RECOVERY TEES VALLEY LTD Existing Generating CMU STV Lines 1 and 2 EfW TS23
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (11 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste SUEZ RECYCLING AND RECOVERY SUFFOLK LTD Existing Generating CMU Suffolk EfW Suffolk EfW +2 more IP6
Active • 2028-29 (T-4), 2027-28 (T-4) ...
64.50 MW
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (2 components)

Existing Energy from Waste Plant (2)

Coal/biomass SUEZ RECYCLING AND RECOVERY SUFFOLK LTD Existing Generating CMU Suffolk EfW IP6
Inactive • 2018-19 (T-1), 2017-18 (T-1)
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (10 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste SOUTH TYNE & WEAR ENERGY RECOVERY LTD Existing Generating CMU STV Lines 4 & 5 EfW STV Lines 4 & 5 EfW +1 more TS23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
61.59 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (3 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste SOUTH TYNE & WEAR ENERGY RECOVERY LTD Existing Generating CMU STV Lines 4 & 5 EfW STV Lines 4 & 5 EfW TS23
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (10 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste NORTHUMBERLAND ENERGY RECOVERY LTD Existing Generating CMU STV Line 3 EfW STV Line 3 EfW +1 more TS23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.06 MW
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (3 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste NORTHUMBERLAND ENERGY RECOVERY LTD Existing Generating CMU STV Line 3 EfW STV Line 3 EfW TS23
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (4 components)
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement) (2)
• 2 stream municipal waste incinerator
Coal/biomass Energy from Waste HANFORD WASTE SERVICES LIMITED Existing Generating CMU Stoke Incinerator Stoke Incinerator +1 more ST4
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (2 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Coal/biomass Energy from Waste HANFORD WASTE SERVICES LIMITED Existing Generating CMU Stoke Incinerator Stoke Incinerator ST4
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Severnside Energy Recovery Centre Severn Road Hallen, Bristol South Gloucestershire BS10 7SP (2 components)
• Existing Energy from Waste Plant
• New Build Energy from Waste Plant
Coal/biomass WEST LONDON ENERGY RECOVERY LTD Existing Generating CMU Severnside ERC Severnside EfW BS10
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (14 components)

Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations. (3)

Coal/biomass Energy from Waste INOVYN CHLORVINYLS LIMITED Existing Generating CMU RuncornERF - Phase 2 RuncornERF - Phase 2 +2 more WA7
Active • 2028-29 (T-4), 2027-28 (T-4) ...
163.30 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (44 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (2)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.19 MW
Potters Yard, Severn Road, Welshpool, Powys SY21 7YE (1 component)

Waste and biomass being combusted to raise steam to bar through a steam turbine

Coal/biomass Sundorne Products (Llanidloes) Limited New Build Generating CMU Potters Yard Rejected SY21
Inactive • 2021-22 (T-4)
Portsmouth ERF, Quartremaine Road, Portsmouth, Hampshire PO3 5QH (9 components)

Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator. (3)

Coal/biomass Energy from Waste VEOLIA UK LIMITED Existing Generating CMU Hampshire ERFs Portsmouth ERF +6 more PO3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.34 MW
Parc Adfer Energy Recovery Facility Deeside Industrial Park (Currently in the process of obtaining an official address Royal Mail address for the facility; please see cover letter). (1 component) Geocoding Needed

An energy from waste facility located in North Wales and designed to generate electricity

Coal/biomass ENFINIUM PARC ADFER LIMITED New Build Generating CMU Parc Adfer
Inactive • 2021-22 (T-4)
Off Green Lane,Stewartby, Bedford, MK43 9LY. (1 component)

Energy from Waste facility located in Bedfordshire. The Facility will utilise conventional mass-burn technology, which is the most well proven Energy from Waste technology currently available. The process will consist …

Coal/biomass ROOKERY SOUTH LIMITED New Build Generating CMU Rookery South ERF MK43
Inactive • 2021-22 (T-4)
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility (3)

Coal/biomass Energy from Waste HOOTON BIO POWER LIMITED New Build Generating CMU Hooton Bio Power Limited Hooton Bio Power Limited +1 more Not Prequalified CH65
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Newlands Road Wentloog Cardiff CF3 2EF (2 components)

Energy From Waste facility (2)

Coal/biomass Energy from Waste Cardiff Bio Power Limited New Build Generating CMU Cardiff Bio Power Limited Mor Hafren Bio Power Limited 1 Not Prequalified CF3
Inactive • 2023-24 (T-4), 2021-22 (T-4)
Newhaven Erf, North Quay Rd, Newhaven, East Sussex, BN9 0AB (1 component)

Steam turbine at energy from waste facility located in Newhaven East Sussex

Coal/biomass VEOLIA UK LIMITED Existing Generating CMU Newhaven ERF BN9
Inactive • 2021-22 (T-4)
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (9 components)

New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included … (3)

Coal/biomass Energy from Waste FCC (E&M) LIMITED Existing Generating CMU Millerhill EfW Millerhill EfW +3 more EH22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.59 MW
Loading map...
Showing 25 locations