Coal/biomass

10 unique locations (189 components)

Active MW: 45862.79 MW
Inactive MW: 2097.95 MW
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (4 components)
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement) (2)
• 2 stream municipal waste incinerator
Coal/biomass Energy from Waste HANFORD WASTE SERVICES LIMITED Existing Generating CMU Stoke Incinerator Stoke Incinerator +1 more ST4
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility (3)

Coal/biomass Energy from Waste HOOTON BIO POWER LIMITED New Build Generating CMU Hooton Bio Power Limited Hooton Bio Power Limited +1 more Not Prequalified CH65
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Newlands Road Wentloog Cardiff CF3 2EF (2 components)

Energy From Waste facility (2)

Coal/biomass Energy from Waste Cardiff Bio Power Limited New Build Generating CMU Cardiff Bio Power Limited Mor Hafren Bio Power Limited 1 Not Prequalified CF3
Inactive • 2023-24 (T-4), 2021-22 (T-4)
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (73 components)
• Generating Unit 1
• Generating Unit 2
• Generating Unit 3
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (52 components)
• Aux. load separately metered
• GT5
• GT8
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Ferrybridge MFE Limited Kirkhaw Lane Off Stranglands Lane Knottingley West Yorkshire WF11 8DX (5 components)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network. (3)

Coal/biomass Energy from Waste ENFINIUM FERRYBRIDGE 1 LIMITED Existing Generating CMU FM1 FM1 +2 more WF11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
EcoPark, Advent Way, Edmonton, London N18 3AG (10 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines. (3)

Coal/biomass Energy from Waste LONDONENERGY LTD Existing Generating CMU LondonWaste LondonWaste +4 more N18
Active • 2025-26 (T-1), 2024-25 (T-4) ...
17.61 MW
Coatbridge, ML5 4UG, Scotland (3 components)

Energy from Waste facility (3)

Coal/biomass Energy from Waste North Lanarkshire Bio Power Limited New Build Generating CMU North Lanarkshire Bio Power Limited North Lanarkshire Bio Power Limited +1 more Not Prequalified ML5
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (6 components)

Aberthaw 7 Coal fired unit (3)

Coal Coal/biomass RWE GENERATION UK PLC Existing Generating CMU CMU_ABTH_MAIN CMU_ABTH_MAIN +2 more CF62
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (30 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 10 locations