Coal/biomass

19 unique locations (307 components)

Active MW: 45862.79 MW
Inactive MW: 2097.95 MW
Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN (10 components)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff. (2)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export up to 35MW. Located in Glass Avenue, Cardiff.
Coal/biomass Energy from Waste VIRIDOR ENERGY LIMITED Existing Generating CMU Cardiff ERF Cardiff ERF +4 more CF24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
95.81 MW
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (11 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste SUEZ RECYCLING AND RECOVERY SUFFOLK LTD Existing Generating CMU Suffolk EfW Suffolk EfW +2 more IP6
Active • 2028-29 (T-4), 2027-28 (T-4) ...
64.50 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (10 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste SOUTH TYNE & WEAR ENERGY RECOVERY LTD Existing Generating CMU STV Lines 4 & 5 EfW STV Lines 4 & 5 EfW +1 more TS23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
61.59 MW
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (10 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste NORTHUMBERLAND ENERGY RECOVERY LTD Existing Generating CMU STV Line 3 EfW STV Line 3 EfW +1 more TS23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.06 MW
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (14 components)

Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations. (3)

Coal/biomass Energy from Waste INOVYN CHLORVINYLS LIMITED Existing Generating CMU RuncornERF - Phase 2 RuncornERF - Phase 2 +2 more WA7
Active • 2028-29 (T-4), 2027-28 (T-4) ...
163.30 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (44 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (2)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.19 MW
Portsmouth ERF, Quartremaine Road, Portsmouth, Hampshire PO3 5QH (9 components)

Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator. (3)

Coal/biomass Energy from Waste VEOLIA UK LIMITED Existing Generating CMU Hampshire ERFs Portsmouth ERF +6 more PO3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.34 MW
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (9 components)

New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included … (3)

Coal/biomass Energy from Waste FCC (E&M) LIMITED Existing Generating CMU Millerhill EfW Millerhill EfW +3 more EH22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.59 MW
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (10 components)

This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 … (3)

Coal/biomass Energy from Waste MERCIA WASTE MANAGEMENT LIMITED Existing Generating CMU Mercia Waste Management Ltd Mercia Waste Management Ltd +2 more Rejected DY10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
51.90 MW
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (9 components)

Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator. (3)

Coal/biomass Energy from Waste VEOLIA UK LIMITED Existing Generating CMU Hampshire ERFs Marchwood ERF +6 more SO40
Active • 2028-29 (T-4), 2027-28 (T-4) ...
40.74 MW
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (13 components)
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net. (2)
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
Coal/biomass Energy from Waste FCC ENVIRONMENT (LINCOLNSHIRE) LIMITED Existing Generating CMU Lincs EFW Lincs EFW +5 more LN6
Active • 2028-29 (T-4), 2027-28 (T-4) ...
46.18 MW
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (11 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste SUEZ RECYCLING AND RECOVERY KIRKLEES LTD Existing Generating CMU Kirklees EfW Kirklees EfW +2 more HD1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.74 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (9 components)

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" … (3)

Coal/biomass Energy from Waste FCC BUCKINGHAMSHIRE LIMITED Existing Generating CMU FCC Buckinghamshire Ltd FCC Buckinghamshire Ltd +2 more HP18
Active • 2028-29 (T-4), 2027-28 (T-4) ...
71.95 MW
Exeter ERF, Grace Road South, Exeter EX2 8QE (11 components)
• Energy from Waste Facility located in Grace Road, Exeter. (2)
• Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and biogenic content. Located in Grace Road, Exeter.
Coal/biomass Energy from Waste VIRIDOR ENERGY LIMITED Existing Generating CMU Exeter ERF Exeter ERF +6 more EX2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.14 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (45 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (44 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Coal OCGT Coal/biomass Open Cycle Gas Turbine (OCGT) DRAX POWER LIMITED Existing Generating CMU DRAX Unit 10 DRAX Unit 12 +29 more YO8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
268.28 MW
Drax Power Station, Drax, Selby, YO8 8PH (18 components)

This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Chineham ERF, Whitmarsh Lane, Basingstoke, Hampshire, RG24 8LL (9 components)

Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator. (3)

Coal/biomass Energy from Waste VEOLIA UK LIMITED Existing Generating CMU Chineham ERF Chineham ERF +6 more RG24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.74 MW
Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (11 components)

This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington … (3)

Coal/biomass Energy from Waste KENT ENVIROPOWER LIMITED Existing Generating CMU Allington EFW Allington EFW +2 more ME16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
98.65 MW
Loading map...