457 unique locations (2799 components) - Page 1 of 19

Active MW: 17008.53 MW
Inactive MW: 492.25 MW
Young's House, Wickham Road, Grimsby DN32 8HW (4 components)
• On-site Generating CMU (2)
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.22 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (9 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used. (2)
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (18 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• One 2MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.39 MW
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (12 components)

The CMU is a gas fired CCGT CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
125.98 MW
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (3 components)

The CMU is a gas fired CCGT CHP (3)

Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (25 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire (1 component) Geocoding Needed

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active • 2027-28 (T-4)
14.23 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (3 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Wight Salads Arreton Newport Isle of Wight PO30 3AR (2 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
5.48 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (2 components)

New-Build CHP Generating Unit at Berry Wicks Farm. (2)

Active • 2028-29 (T-4), 2025-26 (T-4)
1.26 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (12 components)

One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.74 MW
Westexe, Tiverton, Devon, EX16 5LL (6 components)

2026 kW CHP unit (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.65 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
36.30 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (6 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP) E.ON UK PLC CE_Aggregated 3 CE_Aggregated 3 +1 more HA9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.06 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components)

Warrington Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.17 MW
Warrington Hospital, Lovely Lane, Warrington, CheshireWA5 1QG (1 component) Geocoding Needed

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
Warehouse R Royal Victoria Dock Northside London E16 1BA (2 components)

1.2MW Combined Heat and Power Engine (2)

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Warehouse R Royal Victoria Dock Northside London E16 1BA (2 components)

1.2MW Combined Heat and Power Engine (2)

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Waddon Marsh Purley Way Croydon CR0 4NX (1 component)

A reciprocating gas engine CHP providing hot water to a local heat network

Inactive • 2021-22 (T-4)
Waddon Marsh Purley Way Croydon CR0 4NX (1 component)

A reciprocating gas engine CHP providing hot water to a local heat network

Inactive • 2018-19 (T-1)
Loading map...
Showing 25 locations