Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

4 unique locations (152 components)

COFELY Great Coates, Grimsby, DN31 2TT (91 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
5.38 MW
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (38 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• 1.6MW Combined Heat and Power Engine
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.64 MW
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (18 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
82.56 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (5 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2025-26 (T-1), 2019-20 (T-1) ...
1.35 MW
Loading map...
Showing 4 locations