28 unique locations (390 components) - Page 1 of 2

Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (7 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-1) ...
1.45 MW
Stoneykirk Road, Stranraer, DG9 7BU (16 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
3.58 MW
Seal Sands, Middlesbrough, TS2 1UB (20 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesborough, TS2 1UB (20 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Repton Road, Measham, Swadlincote, DE12 7DT (13 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
Ottringham Road Keyingham Hull North Humberside HU12 9RX (8 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Media City Prestwood Road Salford M50 2EQ (7 components)
• 1.8 MW CHP generation
• 1.800 MW CHP generation
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (21 components)
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 5.535MW and additional PSEUDO MPAN's are fitted.
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (16 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (6 components)
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total connection capacity of 1.5MW.
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total connection capacity of 4.5MW.
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection capacity of 9MW.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.10 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (11 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
James Cropper Plc, Burneside Mills, Kendal, LA9 6PZ (11 components)
• Gas fired CHP Unit
• Steam Turbine driven by gas fired CHP (component ID KPEG13)
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Hammersmith Hospital, Du Cane Road, Shepherds Bush, London, W12 0HS (7 components)

A gas turbine CHP, providing steam and electricity to Hammersmith Hospital

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Foresterhill Health Campus, Aberdeen AB25 2AY (6 components)

A gas turbine installed at Aberdeen Royal Infirmary

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Fellside CHP Sellafield Ltd Seascale Cumbria CA20 1PG UK (5 components)

Fellside CHP is located in Seascale- Cumbria- UK and consists of three GE Frame 6581B gas turbines which are able to run on natural gas or distillate. The primary purpose …

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (7 components)

4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (16 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (49 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• TLOR-1 1 ea 38MWe Cogeneration Unit 9G1
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.28 MW
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (5 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (21 components)
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Active • 2025-26 (T-4), 2024-25 (T-4) ...
67.23 MW
Denmark Hill, Brixton, London, SE5 9RS (10 components)
• CHP unit
• Gas fired CHP unit
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
COFELY Great Coates, Grimsby, DN31 2TT (56 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
4.27 MW
Blackshaw Rd, London SW17 0QT (8 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations