Combined Heat and Power (CHP)

39 unique locations (521 components) - Page 1 of 2

Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB (1 component)

Generating Plant located at Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB

Inactive • 2021-22 (T-4)
Staverton, Trowbridge, Wiltshire, BA14 6PH (22 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.60 MW
Station Road, Chartham, Kent, CT4 7JA (1 component)

Generating Plant located at Station Road, Chartham, Kent, CT4 7JA

Inactive • 2021-22 (T-4)
Speke Operations, Fleming Rd, Liverpool L24 9LN (7 components)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807
• Speke combined heat and power plant.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Solenis, Cleckheaton Road, Low Moor, Bradford, United Kingdom, BD12 0JZ (11 components)
• Gas Turbine CHP unit
• Steam turbine
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Seal Sands, Middlesbrough, TS2 1UB (20 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesborough, TS2 1UB (20 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, Norfolk, PE34 3AL (2 components)
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated anciliary plant and buildings.
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated ancillary plant and buildings.
Active • 2028-29 (T-4), 2021-22 (T-4)
42.50 MW
Port Causeway Bromborough Merseyside CH62 4TH (21 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.07 MW
Park Road, Ware. Hertfordshire, SG12 0DP (25 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ottringham Road Keyingham Hull North Humberside HU12 9RX (8 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ormskirk and District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (5 components)
• 1 x gas reciprocating engine with a total rated gross power capacity of 0.900 MW and a net power capacity of 0.869 MW
• Gas reciprocating engine
Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.73 MW
Ninewells Hospital, Dundee, DD2 1UB (9 components)
• A Packaged 3.976MW, 11kV CHP
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Melrow Nursery, Rydings Lane, Southport PR9 8EB (15 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Marsh Road, Banks, Southport PR9 8DX (19 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (21 components)
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 5.535MW and additional PSEUDO MPAN's are fitted.
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (16 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (47 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.96 MW
Lancaster University, Bailrigg, Lancaster, LA1 4YW (9 components)

Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.32 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (11 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (8 components)
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.07 MW
Harmire Road, Barnard Castle, County Durham, DL12 8DT (20 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (9 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Foresterhill Health Campus, Aberdeen AB25 2AY (6 components)

A gas turbine installed at Aberdeen Royal Infirmary

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations