Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

13 unique locations (225 components)

Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (16 components)
• Power Station for Paper plant made up of 1x35MW Gas engine
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.29 MW
Priory Street, Ware, Hertfordshire, SG12 0DJ (13 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Park Road, Ware. Hertfordshire, SG12 0DP (25 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Lonsdale Road, Cumbria, Ulverston, LA12 9DR (16 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (20 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (22 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Edgabaston, Birmingham, West Midlands, B15 2TT (27 components)
• Gas Engine
• Gas engine
• Gas turbine generator
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.28 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (49 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• TLOR-1 1 ea 38MWe Cogeneration Unit 9G1
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.28 MW
Cobden Street, Montrose, Angus, DD10 8EA (12 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Clatterbridge Road, Bebington, Birkenhead, Wirral CH63 4JY (5 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (5 components)

On-site existing CHP generating unit (3)

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
5.61 MW
Loading map...
Showing 13 locations