Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

22 unique locations (162 components)

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (11 components) Geocoding Needed
β€’ Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
β€’ Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
β€’ Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
36.70 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components) Geocoding Needed
β€’ Gas CHP engines in commercial horticultural environment with no auxilliary load
β€’ Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
6.90 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components) Geocoding Needed
β€’ CHP engine in horticultural environment with no auxilliary load
β€’ Two CHP engines in horticultural environment with no auxilliary load
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX02 FLEX02 +2 more CT7
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
24.41 MW
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (9 components) Geocoding Needed

Two gas CHP in a horticultural environment with no aux load

Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
6.50 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (11 components) Geocoding Needed

CHP engine in a horticultural environment, natural gas, no aux load

Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
14.95 MW
Plot 5, Barrow Man Road, Birchington Kent CT7 0AX (8 components) Geocoding Needed

One CHP engine in a horticultural environment with no auxilliary load.

Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
11.60 MW
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (7 components) Geocoding Needed

Two CHP gas engines in commercial horticultural environment with no auxilliary load

Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
23.12 MW
Plot 3, Barrow Man Road, Birchington CT7 0AX (11 components) Geocoding Needed

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.

Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
18.09 MW
Ottringham Road Keyingham Hull North Humberside HU12 9RX (6 components) Geocoding Needed
β€’ Eight gas CHP engines for commercial horticultural use with no auxilliary load
β€’ Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU 888806 FLEX06 +1 more HU12
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
35.50 MW
Minerva Road, Farnworth, Bolton, BL4 0JR (3 components) Geocoding Needed
β€’ CHP generating for site load, which exceeds generating capacity. No aux load.
β€’ CHP generating in NHS hospital. No aux load.
Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU F18102 BL4
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1) ...
3.24 MW
Melrow Nursery, Rydings Lane, Southport PR9 8EB (11 components) Geocoding Needed

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …

Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
6.04 MW
Marsh Road, Banks, Southport PR9 8DX (14 components) Geocoding Needed
β€’ Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
β€’ The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
β€’ The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX33 FLEX33 +1 more PR9
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
12.64 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (8 components) Geocoding Needed

One CHP, generating for site load which exceeds generating capacity. No aux load.

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX108 FLEX32 +1 more EH9
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
5.96 MW
George Square Charles St Lane EH8 9AG (2 components) Geocoding Needed

CHP generating for site load, which exceeds generating capacity. No aux load.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected EH8
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
Frimley Park Hospital, Portsmouth Road, GU16 7UJ (3 components) Geocoding Needed
β€’ CHP generating in NHS hospital. No aux load.
β€’ CHP generating to cover site load, which exceeds generating capacity. No aux load.
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1) ...
3.24 MW
Chareteris Place Edinburgh EH8 8FN (2 components) Geocoding Needed

CHP generating for site load, which exceeds generating capacity. No aux load.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected EH8
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
Bramhall Moor Ln, Pepper Rd, Hazel Grove, Stockport SK7 5BJ (2 components) Geocoding Needed

CHP exporting to a private wire network in a manufacturing environment.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected SK7
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
Bower Building, University of Glasgow, University Avenue, G12 8QQ (2 components) Geocoding Needed

CHP generator exporting to private wire network at the University of Glasgow.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected G12
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
Barrow Man Road Birchington Kent CT7 0AX (11 components) Geocoding Needed
β€’ Two CHP engines in horticultural environment with no auxilliary load
β€’ Two 2.7MW CHP engines. Primary fuel type = Natural Gas
β€’ Two 3.3 MW CHP gas engines. Primary fuel type = Natural Gas
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
29.35 MW
9 Handyside St, Kings Cross, London N1C 4BH (11 components) Geocoding Needed

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
10.44 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (9 components) Geocoding Needed
β€’ District heating implementation of two gas CHP engines with no auxilliary load
β€’ Two 3.0 MW gas CHP engines. Primary fuel type = Natural Gas
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX05 FLEX05 +1 more MK9
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
20.78 MW
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (4 components) Geocoding Needed
β€’ 3 x 1.2MW gas CHP in a hospital environment.
β€’ 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
1.99 MW
Loading map...
Showing 22 locations