Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

8 unique locations (170 components)

Active MW: 17008.53 MW
Inactive MW: 492.25 MW
1 Thane Road West, Nottingham, NG2 3AA (36 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
23.32 MW
Church Manorway, Erith DA8 1DL (36 components)

gas-fired CHP unit (3)

CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU EGEN22 EGEN22 +5 more DA8
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.11 MW
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (33 components)
• 2.8MWe back pressure steam turbine (2)
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
OCGT CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU11 GCMU11 +5 more DN40
Active • 2025-26 (T-4), 2024-25 (T-1) ...
21.95 MW
Perenco UK, Wytch Farm, Thrashers Lane, Corfe Castle, Dorset, BH20 5JR (10 components)

Gas Engine (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX40 GENX40 +1 more BH20
Active • 2025-26 (T-4), 2024-25 (T-1) ...
39.89 MW
RPC Containers Ltd, Schofield Rd, Oakham LE15 6RW United Kingdom (3 components)

CHP Unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN13 ZGEN13 LE15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.11 MW
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (21 components)

CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENY35 GENY35 +6 more HP22
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.84 MW
Solenis, Cleckheaton Road, Low Moor, Bradford, United Kingdom, BD12 0JZ (11 components)

Gas Turbine CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX42 GENX42 +2 more BD12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.17 MW
Station Road, Wigton, Cumbria CA7 9BG (20 components)
• Gas engine (2)
• Gas turbine
OCGT CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU16 GCMU16 +10 more CA7
Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.23 MW
Loading map...
Showing 8 locations