128 unique locations (1964 components) - Page 1 of 6

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.08 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (19 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• One 2MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.18 MW
41.84 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (37 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2921.10 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (14 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.91 MW
Westexe, Tiverton, Devon, EX16 5LL (8 components)

2026 kW CHP unit

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.83 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (6 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (13 components)

Warrington Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.14 MW
0.90 MW
0.91 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (11 components)
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.06 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (12 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2.72 MW
The Ridgeway Enfield, Middlesex EN2 8JL (10 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.02 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (15 components)

Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (31 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.94 MW
The Christie Hospital, Wilmslow Road, Manchester, M20 4BX (1 component)

VIT43A - CHP unit at The Christie Hospital, Wilmslow Road, Manchester, M20 4BX

Active • 2025-26 (T-4)
Thearne Lane, Woodmansey, Beverley, North Humberside, HU17 0SA (3 components)

2 x CHP at a horticultural site

Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.33 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.82 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (26 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.17 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (17 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.21 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (11 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Staithes Road, Preston, Hull, HU12 8TB (23 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.24 MW
Loading map...
Showing 25 locations