Combined Heat and Power (CHP)

102 unique locations (1860 components) - Page 1 of 5

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (25 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.01 MW
167.38 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (43 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire (1 component)

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active • 2027-28 (T-4)
14.23 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (17 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.74 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (10 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
36.28 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.41 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (17 components)

Warrington Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.02 MW
The Ridgeway Enfield, Middlesex EN2 8JL (10 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.03 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (17 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.10 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (12 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.72 MW
Staithes Road, Preston, Hull, HU12 8TB (31 components)
• CHP Unit
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.31 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (5 components)

Gas Fired CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
12.67 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (18 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
29.58 MW
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (14 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
• 2*2 gas reciprocating engines with a total gross power capacity of 4.00 MW and a net power capacity of 3.960 MW.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.63 MW
Solvay, Trinity St, Oldbury, B69 4LW (10 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.28 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (17 components)
• 8.300MW Gas Turbine installation
• 8.3MW Gas Turbine installation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (5 components)

One 2MW gas CHP engine in a horticultural environment

Active • 2027-28 (T-4), 2024-25 (T-1) ...
5.29 MW
15.54 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (25 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
184.43 MW
School Road, Aberdeen AB24 1TU (23 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.22 MW
Loading map...
Showing 25 locations