Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

36 unique locations (351 components) - Page 1 of 2

Active MW: 17008.53 MW
Inactive MW: 492.25 MW
Valley Park Industrial Estate, Meadow Gate, Wombwell, Barnsley, S73 0UN (1 component)

Generating unit

Active • 2025-26 (T-4)
University of Warwick, Coventry, CV4 7AL (48 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL (2)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GC2426 GCMU18 +4 more CV4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (19 components)
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe (2)
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
DSR Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU XGEN24 XGEN24 +6 more E16
Active • 2025-26 (T-4), 2023-24 (T-1) ...
13.16 MW
Taw Valley Creamery, South Weeke, North Tawton, Devon, England, EX20 2DA (4 components)

CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ02 GENZ02 +1 more EX20
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1.76 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (10 components)

Turbomach M50 Natural Gas fired CHP unit (3)

CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU07 GCMU07 +4 more BA14
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.80 MW
Staverton, Trowbridge, BA14 6PG (1 component)

Turbomach M50 Natural Gas fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU07 BA14
Active • 2025-26 (T-1)
4.47 MW
Station Road, Wigton, Cumbria CA7 9BG (20 components)
• Gas engine (2)
• Gas turbine
OCGT CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU16 GCMU16 +10 more CA7
Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.23 MW
Solenis, Cleckheaton Road, Low Moor, Bradford, United Kingdom, BD12 0JZ (11 components)

Gas Turbine CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX42 GENX42 +2 more BD12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.17 MW
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (21 components)

CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENY35 GENY35 +6 more HP22
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.84 MW
RPC Containers Ltd, Schofield Rd, Oakham LE15 6RW United Kingdom (3 components)

CHP Unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN13 ZGEN13 LE15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.11 MW
RPC Containers Limited, Haslingden Road, Guided, Blackburn, Lancashire, BB1 2PX (5 components)

CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GC2409 GENX38 +1 more BB1
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1.78 MW
Port Causeway Bromborough Merseyside CH62 4TH (10 components)

Turbomach M50 Natural Gas fired CHP unit (3)

CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU06 GCMU06 +4 more CH62
Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.03 MW
Pontefract Rd, Leeds, LS10 1AX (10 components)

CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU NGEN35 NGEN35 +3 more LS10
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.39 MW
Perenco UK, Wytch Farm, Thrashers Lane, Corfe Castle, Dorset, BH20 5JR (10 components)

Gas Engine (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX40 GENX40 +1 more BH20
Active • 2025-26 (T-4), 2024-25 (T-1) ...
39.89 MW
Oldfield Ln, Matlock DE4 2LP (2 components)

Gas engine (2)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN10 DE4
Active • 2024-25 (T-4), 2023-24 (T-4)
Oakthorpe Dairy, Chequers Way, Palmers Green, London, England, N13 6DA (4 components)

CHP unit - 1 x 2,000kw (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ01 GENZ01 +1 more N13
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1.71 MW
Minworth Sewage Treatment Works, Kingsbury Road, Minworth, Sutton Coldfield, B76 9DP (4 components)

CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ04 GENZ04 +1 more B76
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1.90 MW
Marston House, Otley Rd, Baildon Shipley, BD17 7JR (1 component)

Generating unit

Active • 2025-26 (T-4)
London Rd, Purfleet RM19 1SD (11 components)

Gas-fired CHP unit (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
Lockerbie Creamery, Lockerbie, England. DG11 1LW (10 components)

CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX37 GENX37 +2 more DG11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
2.55 MW
Len Wright Salads Ltd, Hazeldene, Taylors Meanygate, Tarleton, Lancashire, PR4 6XB (2 components)

CHP unit (2)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN15 PR4
Active • 2025-26 (T-4), 2023-24 (T-4)
Latimer Business Park, Altendiez Way, Burton Latimer, Kettering, Northamptonshire, NN15 5YT (4 components)

Gas engine (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ05 GENZ05 +1 more NN15
Active • 2025-26 (T-4), 2024-25 (T-4) ...
2.32 MW
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (33 components)
• 2.8MWe back pressure steam turbine (2)
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
OCGT CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU11 GCMU11 +5 more DN40
Active • 2025-26 (T-4), 2024-25 (T-1) ...
21.95 MW
Lancaster University, Bailrigg, Lancaster, LA1 4YW (4 components)

Gas fired CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX41 GENX41 +1 more LA1
Active • 2024-25 (T-4), 2023-24 (T-1) ...
1.66 MW
Loading map...
Showing 25 locations