TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (6 components)
• On-Site Generating CMU.
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
38.03 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (36 components)
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
26.32 MW
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (5 components)
• CHP
• Gas Fired - CHP
Active • 2024-25 (T-1), 2023-24 (T-4) ...
The Ridgeway Enfield, Middlesex EN2 8JL (10 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.02 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (15 components)

Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (31 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.94 MW
The fields close to Chear Farm Bungalow, Ely Road, Chittering, Cambridge, CB25 9PN (2 components)
• FENGEN (CMU) is a load reduction asset using lighting and battery energy storage (BESS) for growing of vegetables on an industrial scale.
• FENGH2 (CMU) is a new build generating 06.000MW gas fired CHP plant.
Active • 2028-29 (T-4)
5.41 MW
The Christie Hospital, Wilmslow Road, Manchester, M20 4BX (1 component)

VIT43A - CHP unit at The Christie Hospital, Wilmslow Road, Manchester, M20 4BX

Active • 2025-26 (T-4)
The Billingham Synthetic Plant, Haverton Hill Road, Billingham, TS23 1PY (2 components)

A Turbo Altenator located at the Billingham Plant

Inactive • 2019-20 (T-1)
Thearne Lane, Woodmansey, Beverley, North Humberside, HU17 0SA (3 components)

2 x CHP at a horticultural site

Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.33 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.82 MW
1.27 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (26 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.17 MW
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (7 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-1) ...
1.45 MW
Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB (1 component)

Generating Plant located at Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB

Inactive • 2021-22 (T-4)
Stoneykirk Road, Stranraer, DG9 7BU (16 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
3.58 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (17 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.21 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (22 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.60 MW
Station Road, Wigton, Cumbria CA7 9BG (37 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2024-25 (T-4), 2024-25 (T-1) ...
22.35 MW
Station Road, Chartham, Kent, CT4 7JA (1 component)

Generating Plant located at Station Road, Chartham, Kent, CT4 7JA

Inactive • 2021-22 (T-4)
Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB (6 components)
• 2 x On-site turbo alternators
• 6 x On-site turbo alternators
• Power Recovery Train
Inactive • 2019-20 (T-1)
Loading map...