Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

229 unique locations (2854 components) - Page 3 of 10

Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (11 components)
• Gas CHP in horticultural environment providing heat & electricity for crop growth
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.04 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (14 components)

Callington - Existing Site CHP unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.40 MW
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (29 components)

CHP unit

Active • 2025-26 (T-1), 2024-25 (T-4) ...
5.41 MW
Saltend Power Station Saltend Hull HU12 8GA (36 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19398.68 MW
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (16 components)
• Power Station for Paper plant made up of 1x35MW Gas engine
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.29 MW
Rydings lane, North Meols, West Lancashire, Lancashire, PR9 8EB (4 components)

A gas fuelled Combined heat and Power plant (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.24 MW
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (9 components)

A gas engine CHP site providing steam and electricity to an industrial unit

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (10 components)

Two gas CHP in a horticultural environment with no aux load

Active • 2025-26 (T-4), 2024-25 (T-4) ...
2.11 MW
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (14 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.73 MW
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (13 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity of 5.050 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.300 MW and a net power capacity of 5.109 MW after taking into account generator auxiliary load.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity of 5.290 MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.78 MW
Rocks Dryer, Rosvear Road, Bugle, St. Austell, PL26 8PJ (11 components)
• Gas CHP
• Gas CHP in St. Austell
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.36 MW
Repton Road, Measham, Swadlincote, DE12 7DT (13 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
Queensway Campus Hortonwood, Queensway, Hadley, Telford TF1 7FS (2 components)

On site generating CMU

Active • 2027-28 (T-4), 2024-25 (T-1)
1.80 MW
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (11 components)
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Priory Street, Ware, Hertfordshire, SG12 0DJ (13 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (60 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1271.89 MW
Port Causeway Bromborough Merseyside CH62 4TH (21 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.07 MW
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS (13 components)

Poole Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.13 MW
Pontefract Rd, Leeds, LS10 1AX (21 components)

CHP unit

Active • 2025-26 (T-1), 2024-25 (T-4) ...
4.00 MW
Pond Street London NW3 2QG (10 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG

Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.07 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (13 components)

CHP engine in a horticultural environment, natural gas, no aux load

Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.82 MW
Plot 5, Barrow Man Road, Birchington Kent CT7 0AX (8 components)

One CHP engine in a horticultural environment with no auxilliary load.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.97 MW
Plot 3, Barrow Man Road, Birchington CT7 0AX (13 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
37.42 MW
Loading map...
Showing 25 locations