Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

268 unique locations (3955 components) - Page 5 of 11

Oakthorpe Dairy, Chequers Way, Palmers Green, London, England, N13 6DA (9 components)

CHP unit - 1 x 2,000kw

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.14 MW
Nufarm Wyke Lane, Wyke, Bradford, West Yorkshire, BD12 9EJ (5 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
14.92 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (21 components)
• CHP at a horticultural environment.
• CHP at horticultural site
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.29 MW
Northmoor Lane, Cottingham, Hull HU16 4JN (8 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.67 MW
North Avenue, Marston Green, Birmingham, B40 1NT (20 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ninewells Hospital, Dundee, DD2 1UB (12 components)
• A Packaged 3.976MW, 11kV CHP
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Newton Aycliffe CO Durham DL5 6EA (50 components)
• This is an existing CHP (4)
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
71.99 MW
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (22 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.13 MW
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (11 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.19 MW
16.37 MW
16.70 MW
Muller Milk and Ingredients Market Way, North Petherton, Bridgwater, TA6 6DF (5 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-1) ...
10.11 MW
Morrisons Farmers Boy, Cemetery Road, Greenside Park, Bradford BD8 9RU (3 components)

On-Site Generating CMU

Active • 2025-26 (T-1), 2024-25 (T-1)
2.66 MW
Moorcroft Drive Wednesbury WS10 7DE (8 components)

EnerG 1000 CHP

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.82 MW
Montgomery Road, Aberdeen AB24 2YA (22 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.46 MW
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (8 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.52 MW
Mill Nurseries, Ottringham Road, Keyingham, Hull, HU12 9RX (11 components)

Gas fired CHP unit

Active • 2027-28 (T-4), 2026-27 (T-4) ...
38.57 MW
MILLBROOK PARK ENERGY CENTRE, ROYAL ENGINEERS WAY, LONDON, NW7 1TF (9 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.11 MW
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (10 components)

A gas engine CHP site providing hot water to an industrial unit

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.58 MW
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (17 components)

Nantwich Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.00 MW
10.55 MW
Melrow Nursery, Rydings Lane, Southport PR9 8EB (19 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Marsh Road, Far Banks, North Meols, Banks, West Lancashire, Lancashire, PR9 8DX (8 components)
• A gas fuelled CHP plant
• A gas fuelled Combined Heat and Power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.81 MW
Loading map...
Showing 25 locations