Combined Heat and Power (CHP)

268 unique locations (3955 components) - Page 6 of 11

Marsh Road, Banks, Southport PR9 8DX (24 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Maple Quay CHP, Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (11 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.13 MW
Magna House, Stafford Park 3, Telford, Shropshire, TF3 3BH (6 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Active • 2028-29 (T-4), 2025-26 (T-1)
5.81 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (27 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383

Active • 2028-29 (T-4), 2027-28 (T-4) ...
215.25 MW
Macketts Lane, Arreton, Isle of Wight PO30 3AS (3 components)

The CMU component will have a connection capacity of 7.5MW. Gas-fired reciprocating engine will be the technology used

Active • 2026-27 (T-4)
20.55 MW
London Rd, Purfleet RM19 1SD (28 components)

Gas-fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
29.12 MW
Lockerbie Creamery, Lockerbie, England. DG11 1LW (22 components)

CHP unit

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.09 MW
Lister Hospital, Coreys Mill Lane, Stevenage, Hertfordshire, SG1 4AB (4 components)

1 x Gas reciprocating engine with a total rated gross power capacity of 1.400 MW and a net power capacity of 1.374 MW after considering the generator auxiliary load.

Active • 2028-29 (T-4), 2025-26 (T-1)
4.92 MW
Lindum Mill, Ashby Road, Shepshed, Leicestershire, LE12 9BS (5 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-1) ...
4.36 MW
Lever House, Wood Street, Port Sunlight Wirral, CH42 4XN (4 components)

2x reciprocating gas engines with an aggregate gross capacity of 3.996 MW and net capacity of 3.908 MW

Active • 2028-29 (T-4), 2025-26 (T-1)
14.21 MW
Leeds Rd, Huddersfield HD2 1FG (1 component)

Syngenta - CHP unit

Active • 2024-25 (T-1)
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (71 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
Active • 2025-26 (T-1), 2024-25 (T-1) ...
98.70 MW
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (22 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.29 MW
LANE END, MACKETTS LANE, HALE COMMON, ISLE OF WIGHT, PO30 3AS (1 component)

The CMU component will have a connection capacity of 4.6MW. Gas-fired reciprocating engine will be the technology used

Active • 2026-27 (T-4)
4.20 MW
Land off, Old School, Lane Hereford, HR4 9BP (3 components)
• A 13MW New Build Battery Storage site
• A 6MW New Build CHP site
• A New Build Battery Storage site
Active • 2026-27 (T-4), 2024-25 (T-4)
7.13 MW
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (7 components)
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total connection capacity of 1.5MW.
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total connection capacity of 4.5MW.
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection capacity of 9MW.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
16.20 MW
Lancaster University, Bailrigg, Lancaster, LA1 4YW (12 components)

Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.97 MW
Lake Rd, Trafford Park, Stretford, Manchester M17 1TU, United Kingdom (5 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.33 MW
LADYSMITH ROAD, GRIMSBY, DN32 9EE (4 components)

CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE

Active • 2025-26 (T-4), 2022-23 (T-1)
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (30 components)

Combined Heat and Power Plant Olympic Park London

Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.68 MW
Kimberlow Lane, Heslington, York, YO10 5FJ (2 components)

CHP unit

Active • 2025-26 (T-1), 2024-25 (T-4)
2.09 MW
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (11 components)
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.21 MW
International Conference Centre, Birmingham, B1 2EA (21 components)

1.6MW Combined Heat and Power at International Conference Centre

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.36 MW
Loading map...
Showing 25 locations