Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

387 unique locations (4938 components) - Page 6 of 16

Power Station Road Isle of Grain Rochester ME3 0AR (70 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
684.36 MW
Port Talbot, Port Talbot Works, SA13 2NG (14 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
• Site based CHP - note the primary fuel are Waste Gases
• Site based auto-generation unit ( classified as reciprocating engine for EMR purposes given a Rule Change in 2018 )
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
38.15 MW
Port Causeway Bromborough Merseyside CH62 4TH (34 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
16.14 MW
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS (17 components)

Poole Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.30 MW
Pontefract Rd, Leeds, LS10 1AX (29 components)

CHP unit

Active • 2025-26 (T-4), 2025-26 (T-1) ...
17.16 MW
Pond Street London NW3 2QG (10 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.13 MW
Pond Street London NW3 2QG (2 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG

Inactive • 2021-22 (T-1), 2020-21 (T-1)
Plot 6 Barrow Man Road, Birchington CT7 0AX (17 components)

CHP engine in a horticultural environment, natural gas, no aux load

Active • 2028-29 (T-4), 2025-26 (T-4) ...
11.64 MW
Plot 5, Barrow Man Road, Birchington Kent CT7 0AX (10 components)

One CHP engine in a horticultural environment with no auxilliary load.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.95 MW
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (7 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load

Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.96 MW
Plot 3, Barrow Man Road, Birchington CT7 0AX (16 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.73 MW
Place Farm Glasshouse, A134, Ingham, Suffolk IP31 1NQ (2 components)

2No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment

Active • 2024-25 (T-4), 2023-24 (T-4)
69.52 MW
Pembroke Rd, Merlin's Bridge, Haverfordwest SA61 1JN (10 components)

Existing Generation on existing site - CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.75 MW
Pelham Drive, Bootle, Merseyside, L30 4XN (3 components)

CHP plant

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Park Road, Ware. Hertfordshire, SG12 0DP (33 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
12.70 MW
Par Docks, Par, Cornwall PL24 2SQ (18 components)
• One 3.7 MWe gas fired CHP (Centrax KB5)
• Two 3.7 MWe gas fired CHP
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
6.73 MW
Par Docks, Par, Cornwall PL24 2SQ (13 components)
• One 3.7 MWe gas fired CHP (Centrax KB5)
• Two 3.7 MWe gas fired CHP
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Par CHP, Par Docks, Par, St. Austell, PL24 2BN (15 components)
• CHP unit
• Gas CHP located in St. Austell
Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.94 MW
Overton Mill, Basingstoke, Hampshire RG25 3JG (6 components)

6MW Gas Turbine

Inactive • 2021-22 (T-1), 2020-21 (T-1)
Ottringham Road Keyingham Hull North Humberside HU12 9RX (10 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ormskirk & District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (4 components)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.077 MW

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Ormskirk and District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (6 components)
• 1 x gas reciprocating engine with a total rated gross power capacity of 0.900 MW and a net power capacity of 0.869 MW
• Gas reciprocating engine
Active • 2028-29 (T-4), 2025-26 (T-1) ...
1.46 MW
Oldfield Ln, Matlock DE4 2LP (2 components)

Gas engine

Active • 2024-25 (T-4), 2023-24 (T-4)
Oakthorpe Dairy, Chequers Way, Palmers Green, London, England, N13 6DA (9 components)

CHP unit - 1 x 2,000kw

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.14 MW
Loading map...
Showing 25 locations