Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

387 unique locations (4938 components) - Page 7 of 16

Nufarm Wyke Lane, Wyke, Bradford, West Yorkshire, BD12 9EJ (5 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
14.92 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (21 components)
• CHP at a horticultural environment.
• CHP at horticultural site
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.29 MW
Northmoor Lane, Cottingham, Hull HU16 4JN (8 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.67 MW
North Lonsdale Road, Cumbria, Ulverston, LA12 9DR (22 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
North Devon District Hospital, North Rd, Barnstaple, EX31 4JB (4 components)

1 x Gas reciprocating engine with a total rated gross power capacity of 0.801 MW

Inactive • 2022-23 (T-4), 2019-20 (T-1)
North Avenue, Marston Green, Birmingham, B40 1NT (20 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ninewells Hospital, Dundee, DD2 1UB (12 components)
• A Packaged 3.976MW, 11kV CHP
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Newton Aycliffe CO Durham DL5 6EA (50 components)
• This is an existing CHP (4)
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
71.99 MW
NEWLINCS Integrated Waste Management Facility. South Marsh Road, Stallingborough, NE Lincs, DN41 8BZ (4 components)

The component corresponds to one gas turbines embedded into a CHP located on an industrial plant. The turbine exports electricity onto the site's private network.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
NEWLINCS Integrated Waste Management Facility. South Marsh Road, Stallingborough, NE Lincs, DN41 8BZ (2 components)

The component corresponds to one gas turbines embedded into a CHP located on an industrial plant. The turbine exports electricity onto the site's private network.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (22 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.13 MW
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (11 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.19 MW
16.37 MW
16.70 MW
Muller Milk and Ingredients Market Way, North Petherton, Bridgwater, TA6 6DF (5 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-1) ...
10.11 MW
Morrisons Farmers Boy, Cemetery Road, Greenside Park, Bradford BD8 9RU (3 components)

On-Site Generating CMU

Active • 2025-26 (T-1), 2024-25 (T-1)
2.66 MW
Moorcroft Drive Wednesbury WS10 7DE (8 components)

EnerG 1000 CHP

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.82 MW
Moorcroft Drive Wednesbury WS10 7DE (2 components)

EnerG 1000 CHP

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.91 MW
Montgomery Road, Aberdeen AB24 2YA (22 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.46 MW
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (8 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.52 MW
Minerva Road, Farnworth, Bolton, BL4 0JR (7 components)
• CHP generating for site load, which exceeds generating capacity. No aux load.
• CHP generating in NHS hospital. No aux load.
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Mill Nurseries, Ottringham Road, Keyingham, Hull, HU12 9RX (11 components)

Gas fired CHP unit

Active • 2027-28 (T-4), 2026-27 (T-4) ...
38.57 MW
Loading map...
Showing 25 locations