Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (38 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• 1.6MW Combined Heat and Power Engine
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.64 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (26 components)
• The CMU BREH14 consists of two CHP components supplying heat, CO2 and power to the on site Nursery.
• The CMU BREH14 consists of two CHP components supplying heat, CO2 and power to the on-site Nursery.
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
55.68 MW
Estates & Facilities, North Devon District Hospital, Raleigh Park, Barnstaple, EX31 4JB (2 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.800 MW

Active • 2028-29 (T-4), 2025-26 (T-1)
1.45 MW
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (36 components)
• TG1B is part of the aggregated CMU EMD-18, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND BMU' and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD-18' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. There is a project currently in construction phase to install separate metering for the auxiliary power for both TG1B and Unit 3. This will provide half hourly meters for the auxiliary load for the two units, these will be installed in time to pass a Metering Test for the delivery of this Capacity Market (they are planned for completion on 28th September 2018). This was previously agreed with the settlements body as part of an appeal process for the T-4 2018 capacity market auction. In this appeal the capacity market settlements body accepted ExxonMobil's appeal for the auxiliary meters to be installed in time for the capacity market delivery period 2018/19 i.e. 1st October 2018. For now, using the same method as for the T4 -2018 Capacity Market, (with the successful appeal) we have determined the auxiliary load for TG1B to be 2.024 MW (based on the total auxiliary consumption over the three Highest TG1B+Unit 3 Generation points) which represents on average 7.954% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 7.954/3 = 2.6513% of MSID 7096, thus 2.024 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU- i.e. Unit 3). To clarify the 3 units within the refinery boundary, they are Unit 5 (EMG-18) and TG1B and Unit 3 (which make up EMD-18). Unit 5 now has half hourly meters installed on the auxiliary load so the estimate on auxiliary load for now is only for Unit 3 and TG1B. This will move to half hourly metering for Unit 3 and TG1B once the auxiliary load meters are installed by 28th September 2018. Gross 3 HH av. peak generation from TG1B on separate days = 56.634 MW At these three HH times, aux load on TG1B = 2.024 MW Net generation from TG1B = 54.610 MW
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD-19' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. To clarify the 3 units within the refinery boundary, they are Unit 5 (EMG-19) and TG1B and Unit 3 (which make up EMD-19). Gross 3 HH av. peak generation from TG1B on separate days = 49.863 MW At these three HH times, aux load on TG1B = -1.468 MW Net generation from TG1B = 48.394 MW
• TG1B is part of the aggregated CMU EMD-20, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD-20' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. To clarify the 3 units within the refinery boundary, they are Unit 5 (EMG-20) and TG1B and Unit 3 (which make up EMD-20). Gross 3 HH av. peak generation from TG1B on separate days = 49.863 MW At these three HH times, aux load on TG1B = -1.468 MW Net generation from TG1B = 48.394 MW The 48.394MW described above is the historical proven capacity. However, based on the planned future availability of this unit, we wish to submit a conservative 18MW connection capacity. To clarify the numbers provided in the application page are in half hourly periods, as the units specified were MWh and therefore reporting half hourly period was required.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
298.05 MW
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (10 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-21 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 137.533 MW At these three HH times, aux load on Unit 5 = 2.513 MW Net generation from Unit 5 = 135.020 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCO1. All Components of EMG-18, EMD-U3 and EMD-T1 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. Gross 3 HH av. peak generation from Unit 5 on separate days = 139.707 MW At these three HH times, aux load on Unit 5 = 2.517 MW Net generation from Unit 5 = 137.190 MW
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
379.81 MW
Engie Great Coates, Grimsby, DN31 2TT (19 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.05 MW
Engie Great Coates, Grimsby, DN31 2TT (40 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …

Active • 2024-25 (T-1), 2023-24 (T-1) ...
20.70 MW
Energy Hub, Corner of Rodney Road and Heygate Street, London, SE17 1FJ (18 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.74 MW
Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (11 components)
• VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
• VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.04 MW
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (32 components)

A gas engine CHP site providing electricity & heat to the associated development

Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.17 MW
Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ (1 component)

VIT42A - CHP unit at Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ

Active • 2025-26 (T-4)
Energy Centre, Lower Mosley Street, Manchester M2 3GX (12 components)

A 3.36MW gas fired reciprocating engine CHP.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.96 MW
ENERGY CENTRE, 13 HOOKERS ROAD, WALTHAMSTOW, LONDON, E17 6DPTQ 358 896 , (3 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2026-27 (T-4), 2025-26 (T-4)
1.02 MW
ENERGY CENTRE, 13 HOOKERS ROAD, WALTHAMSTOW, LONDON, E17 6DPTQ 358 896 , (5 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.13 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (70 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.81 MW
Ellifoot Lane, Burstwick, HU12 9EB (7 components)
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
29.03 MW
Dunswell Lane, Cottingham, Hull HU16 4JT (2 components)

1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW.

Active • 2028-29 (T-4), 2025-26 (T-1)
1.91 MW
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (29 components)
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Active • 2025-26 (T-4), 2024-25 (T-4) ...
134.46 MW
Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA (11 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.75 MW
Drakemyre, Dalry KA24 5JJ (33 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
42.42 MW
Denmark Hill, Brixton, London, SE5 9RS (15 components)
• Behind the Meter CHP Unit
• CHP unit
• Gas fired CHP unit
Active • 2025-26 (T-1), 2023-24 (T-4) ...
3.86 MW
Denison Road, Selby, North Yorkshire YO8 8AN (24 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.51 MW
Denison road, Selby, North Yorkshire, YO8 8AN. (12 components)

Gas Turbine Cogeneration Unit GT3

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.01 MW
Darent Valley Hospital, Darenth Wood Rd, Dartford, DA2 8DA (9 components)

1280 KWe Combined Heat and Power unit.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.15 MW
Dalmarnock, 120 Cotton Street, Glasgow, G40 4HU (6 components)

CHP at a water treatment works in Glasgow.

Active • 2025-26 (T-4), 2024-25 (T-1) ...