Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR

6 unique locations (27 components)

Active MW: 272273.84 MW
Inactive MW: 3790.51 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (4 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 KnotKirkThry S64
Active • 2025-26 (T-4), 2024-25 (T-4) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
• 0.500MW Battery Energy Storage System (2)
• 0.5MW of demand reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT002 NG2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Norbord Cowie Station Road Cowie Stirling FK7 7BQ (6 components)

3.600MW of demand reduction (3)

DSR LIMEJUMP LTD Proven DSR CMU DSRL26 DSRL26 +2 more FK7
Active • 2026-27 (T-4), 2025-26 (T-4) ...
FORD STREET NORTH - BUS DEPOT 2 FORD STREET COVENTRY CV1 5WT (3 components)
• 1.500MW Demand reduction at Coventry Bus Depot (2)
• bus depot site
DSR BESS Holdco 14 Limited ZENOBE RENTAL 12 LIMITED Unproven DSR CMU Abellio Walworth CV1
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System (2)
• 0.25MW of Demand Reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 YO25
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (4 components)
• 1.200MW Battery Energy Storage System (2)
• 1.2 MW of demand reduction
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 KnotKirkThry WF11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 6 locations