Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR

20 unique locations (725 components)

Active MW: 272273.84 MW
Inactive MW: 3790.51 MW
Ashgrove Road West, Aberdeen AB16 5UL (13 components)

District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (3)

DSR CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX24 FLEX24 Rejected AB16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.73 MW
Bowland View, Fulwood, Preston, Lancashire PR2 5QT (6 components)

Standby generation (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU F20112 F20112 +2 more PR2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU Ledi Ledi +2 more S33
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Bush Estate, Penicuik EH26 0QA (6 components)

Load reduction on site supported by standby generation (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU F20116 F20116 +2 more EH26
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Deansford Lane, DY10 4NB (10 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX73 FLEX73 +7 more DY10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (6 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX73 FLEX73 +3 more WR12
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (16 components)

load curtailment at site (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX67 FLEX67 +8 more OX11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (7 components)
• Water source heat pump at 1883kW each (2)
• Water source Heat Pumps at 1883KW each
DSR FLEXITRICITY LIMITED Proven DSR CMU Conival FLEX162 +1 more RG40
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Joan Ln, Bamford, Hope Valley S33 0AW (7 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU Ledi Ledi +4 more S33
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (10 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX73 FLEX73 +7 more ST13
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Manchester Rd, Carrington, Manchester M31 4TG (15 components)

load curtailment at site (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU Carnoustie FLEX66 +8 more M31
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Meerbrook, Leek, Staffordshire, ST13 8SN (8 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU Ledi Ledi +5 more ST13
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Mythe Road. Tewkesbury. Gloucester. GL20 6AA (10 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX73 FLEX73 +7 more GL20
Active • 2028-29 (T-4), 2027-28 (T-4) ...
N/A (442 components) Geocoding Needed
• DSR components shall be assigned prior to the start of the Delivery Year.
• We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties involved.
• bus depot site
DSR EDF ENERGY CUSTOMERS LIMITED E.ON UK PLC ZENOBE RENTAL 12 LIMITED +8 more Unproven DSR CMU CMU_GE_DSR1 DSRUNP(MIX) +286 more
Active • 2028-29 (T-4), 2027-28 (T-4) ...
NA (112 components) Geocoding Needed
• DSR components shall be assigned prior to the start of the Delivery Year. (2)
• DSR components to be assigned prior to the start of the Delivery Year.
DSR FLEXITRICITY LIMITED Unproven DSR CMU F20114 F20119 +60 more
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Neachley Ln, Shifnal TF11 8PQ (10 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX73 FLEX73 +7 more TF11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Saltend Lane, HULL, HU12 8PP (20 components)
• Load reduction (2)
• Load reduction on site
DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX77 FLEX77 +14 more HU12
Active • 2028-29 (T-4), 2027-28 (T-4) ...
School Road, Aberdeen AB24 1TU (13 components)

District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (3)

DSR CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX24 FLEX24 Rejected AB24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.22 MW
Sheeplands Farm, Twyford Road, Wargrave, Reading, RG10 8DJ (4 components)
• Water source Heat Pumps at 1748KW each (2)
• Water source Heat Pumps at 1748KW each - located at Horticultural site
DSR FLEXITRICITY LIMITED Unproven DSR CMU Conival FLEX162 RG10
Active • 2027-28 (T-4), 2024-25 (T-1) ...
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (5 components)
• Water source heat pumps at 1748kW each (2)
• Water Source Heat Pumps at 1748KW each (x2)
DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX162 FLEX162 GU7
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 20 locations