Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR

21 unique locations (752 components)

Active MW: 272273.84 MW
Inactive MW: 3790.51 MW
SK4 (25 components)
• Domestic demand turn down (2)
• Domestic EV charge point
Active • 2028-29 (T-4), 2025-26 (T-1) ...
RG42 (33 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2028-29 (T-4), 2025-26 (T-1) ...
RG2 (46 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2028-29 (T-4), 2025-26 (T-1) ...
RG10 (27 components)
• Domestic demand turn down (2)
• Domestic EV
Active • 2028-29 (T-4), 2025-26 (T-1) ...
PR7 (61 components)
• Domestic demand turn down (2)
• Domestic EV
Active • 2028-29 (T-4), 2025-26 (T-1) ...
PR6 (39 components)
• Domestic demand turn down (2)
• Domestic EV
Active • 2028-29 (T-4), 2025-26 (T-1) ...
PR25 (20 components)
• Domestic demand turn down (2)
• Domestic EV
Active • 2028-29 (T-4), 2025-26 (T-1) ...
PO10 (17 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-1) ...
HA6 (69 components)
• Domestic demand turn down (2)
• Domestic EV
Active • 2028-29 (T-4), 2025-26 (T-1) ...
DG2 (10 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-1) ...
DE65 (42 components)
• Domestic demand turn down (2)
• Domestic EV charge point
Active • 2028-29 (T-4), 2025-26 (T-1) ...
DE22 (39 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2028-29 (T-4), 2025-26 (T-1) ...
CW5 (42 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-1) ...
CR8 (22 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-1) ...
CM3 (65 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2028-29 (T-4), 2025-26 (T-1) ...
CM13 (43 components)
• Domestic demand turn down (2)
• Domestic EV
Active • 2028-29 (T-4), 2025-26 (T-1) ...
CB24 (59 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2028-29 (T-4), 2025-26 (T-1) ...
BS36 (13 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-1) ...
BS23 (12 components)
• Domestic demand turn down (2)
• Domestic EV charge point
Active • 2028-29 (T-4), 2025-26 (T-1) ...
BS16 (61 components)
• Domestic demand turn down (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2028-29 (T-4), 2025-26 (T-1) ...
B48 (7 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Loading map...
Showing 21 locations