DSR

8 unique locations (474 components)

Active MW: 272273.84 MW
Inactive MW: 3790.51 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (4 components)
• 1.200MW Battery Energy Storage System (2)
• 1.2 MW of demand reduction
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 KnotKirkThry WF11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System (2)
• 0.25MW of Demand Reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 YO25
Active • 2025-26 (T-4), 2024-25 (T-4) ...
FORD STREET NORTH - BUS DEPOT 2 FORD STREET COVENTRY CV1 5WT (3 components)
• 1.500MW Demand reduction at Coventry Bus Depot (2)
• bus depot site
DSR BESS Holdco 14 Limited ZENOBE RENTAL 12 LIMITED Unproven DSR CMU Abellio Walworth CV1
Active • 2027-28 (T-4), 2024-25 (T-4) ...
N/A (442 components) Geocoding Needed
• DSR components shall be assigned prior to the start of the Delivery Year.
• We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties involved.
• bus depot site
DSR EDF ENERGY CUSTOMERS LIMITED E.ON UK PLC ZENOBE RENTAL 12 LIMITED +8 more Unproven DSR CMU CMU_GE_DSR1 DSRUNP(MIX) +286 more
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (5 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
DSR Storage (Duration 1h) FAREHAM ENERGY RESERVE 2 LIMITED LIMEJUMP LTD Unproven DSR CMU New Build Generating CMU FAR226 PO14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.42 MW
Norbord Cowie Station Road Cowie Stirling FK7 7BQ (6 components)

3.600MW of demand reduction (3)

DSR LIMEJUMP LTD Proven DSR CMU DSRL26 DSRL26 +2 more FK7
Active • 2026-27 (T-4), 2025-26 (T-4) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
• 0.500MW Battery Energy Storage System (2)
• 0.5MW of demand reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT002 NG2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (4 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 KnotKirkThry S64
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 8 locations