Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR

9 unique locations (48 components)

Active MW: 461363.03 MW
Inactive MW: 46264.47 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham TS22 5PW (1 component)

5.2MW of batteries across several sites

DSR Limejump Virtual 1 Limited Unproven DSR CMU Anesco DSR01 Rejected TS22
Inactive • 2018-19 (T-1)
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (10 components) Geocoding Needed
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
• Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (1B) +1 more TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.69 MW
Breach Farm, Cadley Lane, Caldwell, Swadlincote DE12 6RJ (1 component)

9.8 MW Storage facility located at Swadlincote

DSR Limejump Virtual 1 Limited Unproven DSR CMU Anesco DSR03 Rejected DE12
Inactive • 2018-19 (T-1)
Breach Farm, Cadley Lane, Caldwell, Swadlincote, DE12 6RJ (1 component) Geocoding Needed

9.8 MW Storage facility located at Swadlincote

Inactive • 2018-19 (T-1)
8.46 MW
Hungerford Farm, Winchfield, Hook RG27 8SW (1 component)

5.4 MW of battery storage units across different sites

DSR Limejump Virtual 1 Limited Unproven DSR CMU Anesco DSRA02 Rejected RG27
Inactive • 2018-19 (T-1)
Hungerford Farm, Winchfield, Hook, RG27 8SW (10 components) Geocoding Needed
• 1.200MW of battery storage located at Hook.
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (2B) +1 more RG27
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.69 MW
Land North of Clayhill Farm Westoning MK45 5JD (2 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
DSR Storage LIMEJUMP LTD Unproven DSR CMU New Build Generating CMU Banana Clayhill MK45
Inactive • 2021-22 (T-4)
Land North of Clayhill Farm, Westoning, MK45 5JD (11 components) Geocoding Needed
• 6 MW Battery Storage facility located at Westoning.
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
DSR Storage Storage (Duration 1h) CLAYHILL SOLAR LIMITED Existing Generating CMU Clayhill MK45
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.24 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (11 components) Geocoding Needed
• 20.000 MW of battery storage located at Macclesfield.
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGHUL2 AGHUL2 +2 more SK10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.21 MW
Loading map...
Showing 9 locations