NEMO (Belgium)

2 unique locations (13 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Ramsgate Road, Sandwich, Kent CT13 9NL (10 components)
• 1,000MW electricity interconnector between GB and Belgian transmission systems
• 1,000MW electricity interconnector between GB and Belgian transmission systems. The Nemo Link interconnector will consist of subsea and underground cables connected to a converter station in each country, which will allow electricity to flow in either direction between the two countries. Nemo Link® will build the converter station on an 8 hectare site, formerly occupied by the Richborough Power Station, which now forms part of the Richborough Energy Park proposals. A similar converter station will be built in the industry zone Herdersbrug in Bruges.
NEMO (Belgium) NEMO LINK LIMITED Existing Interconnector CMU NEMO Link NEMOGB +2 more CT13
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Nemo Link Converter Station, Ramsgate Road, Sandwich, Kent CT13 9NL (3 components)
• The Nemo Link Interconnector is a joint venture between National Grid Interconnector Holdings Limited, a subsidiary company of the UK?s National Grid Plc, and the Belgian Elia group. The Interconnector electrically connects Belgium and GB providing both countries with improved grid reliability and access to sustainable generation. Nemo Link consists of subsea and underground cables connected to a converter station and an electricity substation in each country, which allows electricity to flow in either direction between the two countries. The Interconnector commenced commercial operations on 31st January 2019.
• The Nemo Link interconnector is a joint venture between National Grid Interconnector Holdings Limited, a subsidiary company of the UK?s National Grid Plc, and the Belgian Elia group. The interconnector electrically connects Belgium and GB providing both countries with improved grid reliability and access to sustainable generation. Nemo Link consists of subsea and underground cables connected to a converter station and an electricity substation in each country, which allows electricity to flow in either direction between the two countries. The interconnector commenced commercial operations on 31st January 2019.
NEMO (Belgium) NEMO LINK LIMITED Existing Interconnector CMU NEMOGB NEMOGB CT13
Active • 2029-30 (T-4), 2028-29 (T-4) ...