Open Cycle Gas Turbine (OCGT)

8 unique locations (34 components)

Active MW: 75316.61 MW
Inactive MW: 965.40 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (10 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
Coal Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_ABTH_7C CMU_ABTH_8C +2 more CF62
Inactive • 2021-22 (T-1), 2017-18 (T-1)
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (4 components)

The CMU component is a combined cycle gas turbine (2)

Combined Cycle Gas Turbine (CCGT) CARRINGTON POWER LIMITED Existing Generating CMU Carrington_1 Carrington_1 +2 more M31
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (6 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 1 converted to open cycle operation please see letter uploaded in metering section that explains determination of three highest HH periods
• Killingholme Module 2 converted to open cycle operation
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) UNIPER GLOBAL COMMODITIES SE Existing Generating CMU Killingholme Module 1 Killingholme Module 1 (GCA) +4 more DN40
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (3 components)
• Cowes 1 - OCGT, fuel is gas-oil
• Cowes 2 - OCGT, fuel is distillate
• Cowes 2 - OCGT, fuel is gas-oil
Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_COWE1 CMU_COWE2 +1 more PO32
Inactive • 2019-20 (T-1), 2017-18 (T-1)
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (2 components)

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near … (2)

Combined Cycle Gas Turbine (CCGT) ROCKSAVAGE POWER COMPANY, LTD. Existing Generating CMU Rocksavage Rocksavage WA7
Active • 2024-25 (T-1), 2017-18 (T-1)
741.88 MW
Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL (2 components)
• Deeside CCGT Power Station.
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text on the EMR Portal screen mentions Rule 3.6.3(b) and the commitment to secure TEC by 18 months before the Delivery Year. DEEP_1 is applying for the Supplementary Auction only and therefore this option has been used in relation to Rule 3.10A.2, where TEC is required by 6 months prior to the Delivery Year.
Combined Cycle Gas Turbine (CCGT) DEESIDE POWER (UK) LIMITED Existing Generating CMU Deeside Deeside CCGT CH5
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Keadby Power Station, Trentside, Scunthorpe, North Lincolnshire, DN17 3EF (4 components)
• Keadby 1 CCGT
• Keadby GT3
• Keadby Unit 1
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (3 components)

Existing CCGT (3)

Combined Cycle Gas Turbine (CCGT) SUTTON BRIDGE POWER GENERATION Existing Generating CMU Sutton Bridge Sutton Bridge +1 more PE12
Active • 2025-26 (T-1), 2024-25 (T-1) ...
1551.59 MW
Loading map...
Showing 8 locations